BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 17, 2025 at 8:00 PM

Updated October 31, 2025

Site work for a water / sewer project in Morris, Illinois. Completed plans call for site work for a water / sewer project.

The City of Morris is seeking qualified Construction Managers to provide pre-construction services for the design and construction of a new water treatment facility For any questions, please contact Stan Knudson at sknudson@morrisil.org. The pre-construction services shall include, but are not limited to, the following: 1. Design Development and Cost Estimation a. Upon completion and Owner approval of schematic or preliminary design documents, prepare a detailed estimate with supporting data, including potential trade contractor data where feasible. b. During the preparation of design development or comparable detail documents, update and refine this estimate at intervals as agreed upon with the Owner. c. When design development documents are completed and approved, prepare a further detailed estimate including potential trade contractor data for review by the Design Professional and approval by the Owner. d. During preparation of drawings and specifications, continuously update and refine cost estimates. e. Notify and provide recommendations to the Owner if any estimate exceeds previously approved budgets. 2. Construction Document Review a. Review drawings and specifications for constructability issues that could impact project costs or schedule. b. Issue reports identifying potential problems to the Design Professional and Owner for review and action. c. Promptly report any errors or omissions discovered in the documents. 3. Temporary Facilities a. Recommend temporary construction facilities, equipment, materials, and services needed by the Construction Manager, its subcontractors, and suppliers. 4. Long-Lead Item Procurement a. Advise the Owner and Design Professional on scheduling for procurement of long-lead items necessary to meet the project schedule. b. Assist in expediting long-lead item deliveries. 5. Solicitation of Subcontractors and Suppliers a. Identify and develop a list of qualified subcontractors and suppliers for major project components. b. Assist the Owner in soliciting and evaluating bids, noting any objections from the Owner or Design Professional. c. Follow Owner directives regarding specific subcontractor engagement. 6. Equal Employment Opportunity and Affirmative Action a. Collaborate with the Owner on EEO and affirmative action programs applicable to project work. 7. Consultant Coordination a. Assist the Owner in selecting, retaining, and coordinating with surveyors, testing laboratories, and other specialized consultants.

Post-Bid

Water / Sewer

$200,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
449
Active Projects
239
Bidding Soon
3,333
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2025

March 2, 2026

Project location map

To Be Determined, Morris, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.