BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 19, 2025 at 8:00 PM

Updated October 9, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Wilton, Connecticut. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Replacement of Bridge No. 04976 The Bidder's Prequalification approval letter signed by the CTDOT Contracts Manager shall be included as part of the bid package submitted to the Municipality. NOTE: Any Contractor or Subcontractor engaged in surface preparation and/or coating application must be certified by the Steel Structures Painting Council. NOTE: A Surety Company Bond, on the form furnished by the Municipality, for at least 30 percent of the amount of the bid must accompany each proposal. The Municipality reserves the right to reject any and all bids.

Post-Bid

Bridges / Tunnels

$600,000.00

Public - City

Demolition, New Construction, Paving, Site Work

73

4

23

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
842
Active Projects
308
Bidding Soon
7,040
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.