BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 9, 2025 at 8:00 PM

Updated September 10, 2025

Site work for a power facility in Dover, Delaware. Conceptual plans call for site work for a power facility.

If you have questions concerning this Request for Proposal, they must be made in writing and emailed to me at doverwhse@dover.de.us. All questions must be submitted no later than September 26, 2025. The City of Dover reserves the right to request corrections, clarifications, and/or additional information pertaining to the proposer's response. The contract shall be awarded within 90 days of the closing date to the offeror whose proposal is determined in writing to be most advantageous to the City. All prices must be held firm for a minimum of 90 days from the date of the opening. The proposals and summaries shall not be open for public inspection until after receipt of a fully executed contract. Public employees and elected officials must discharge their duties impartially so as to assure competitive access to governmental procurement by responsible contractors. Moreover, they should conduct themselves in such a manner as to foster public confidence in the integrity of City procurement. Dover Code Article II Section 30 (Appendix A of this policy), establishes standards of ethical conduct among public officials and employees. Vendors participating in the City procurement will be disqualified from the procurement if the employee, official or vendor is found to be in violation of the City's ethical standards and a referral of the matter will be presented to the Ethics Commission. The City of Dover reserves the right to waive technicalities, to reject any or all submissions, or any portion thereof, to advertise for new proposals, to proceed to do the work otherwise, or to abandon the work, if in the best interest of the City. All vendors must completely fill out, sign, date, and return the attached "Consent for Disclosure Under the Freedom of Information Act (FOIA)" form with their submission. Failure to return the completed form will be deemed consent to the disclosure of all information included in the submission after the receipt of a signed contract or issuance of a purchase order. Any and all proprietary information contained within the bid must be isolated and clearly marked. The cover must indicate that the bid contains such information. Local vendor preference shall be considered for materials, equipment, construction contracts, and utility contracts. Local vendor preference shall be three percent (3%) of the annual value of the award. The term local vendor is defined as a gradually increasing range with preference assigned as follows: Rule 1: Vendor located within the city limits of the City of Dover. Rule 2: Vendor located within Kent County, Delaware (applicable only if no vendor qualifies under rule 1) Rule 3: Vendor located within the State of Delaware (applicable only if no vendor qualifies under rules 1 & 2) A performance bond shall be required from the successful proposer for a construction contract. Such a bond shall be for the full amount of the contract. If the contractor fails to provide such a bond or a binder within fifteen days of the award of the contract, the award of the contract or the contract shall be void. The bond shall be released by the City of Dover upon successful completion of the contract and upon a detailed inspection of the contracted work. In the event the contractor does not fulfill its obligations under the terms and conditions of this contract, the City of Dover may contract for an equivalent product on the open market. Any difference in cost between the contract prices herein and the price of open market product shall be the responsibility of the contractor. Under no circumstances shall monies be due the contractor in the event open market products can be obtained below contract cost. Any monies charged to the contractor may be deducted from an open invoice. Neither the contractor nor the City of Dover shall be held liable for non-performance under the terms and conditions of this contract due but not limited to, government restriction, strike, flood, fire, or unforeseen catastrophe beyond either party's control. Each party shall notify the other in writing of any situation that may prevent performance under the terms and conditions of this contract. Vendors must provide references to the City of Dover upon request. Vendor references may be checked to verify the proposer's ability to perform the contract requirements, the quality of work, and the ability to meet obligations. The City of Dover shall have the right to reject any or all proposals if deemed to be in the best interest of the City, such as but not limited to local vendor preference and minority vendor preference while awarding. The method of Contractor Selection has not been Determined at this time.

Conceptual

Power Plant

$500,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
462
Active Projects
189
Bidding Soon
2,540
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2026

Project location map

To Be Determined, Dover, DE

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.