BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 17, 2026 at 8:00 PM

Updated May 20, 2026

Demolition, site work, paving and new construction of a civil project in Farmington, California. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

As of April 17, 2026, a construction manager has been selected for the project. Although a firm timeline for construction has not been determined, construction is not expected to start prior to March of 2027. *The closed solicitation has been included below for reference: The San Joaquin County Department of Public Works (SJCDPW) requests technical proposals from qualified construction management (CM) firms to undertake, perform, and complete the tasks outlined in the Request for Proposals. The selected CM firm will perform professional and technical engineering services for the proposed Escalon Road Bridge Replacement Project. The requested professional construction management services shall include, but are not limited to: constructability review, contract administration, part-time resident engineering, full-time construction inspection, public outreach, labor compliance review, stakeholder coordination, quality assurance, materials sampling and testing, and maintenance of project records for the PROJECT. The scope of work also encompasses documentation of preconstruction conditions, schedule and lead periodic meetings, review of material submittals and construction schedules, responses to requests for information (RFIs), management of contract modifications, change orders, and claims, coordination with stakeholders, and preparation and distribution of project-related notifications, including those required by regulatory agencies before and after construction. Additional responsibilities include project closeout, punch-list preparation and final acceptance, development of as-built drawings, and other miscellaneous construction administration tasks. Estimated Construction Contract Award Date: October 2026 Estimated Construction Duration for Bird Netting: 5 working Days Estimated Bridge Construction Start Date: March 8, 2027 Estimated Bridge Construction Duration: 181 Working Days Total Estimated Contractor's Contract (5 working days for Netting + Bridge Construction): 186 Working Days For general questions regarding the solicitation, please contact Mr. Nhan Tran, Management Analyst II at email: ntran@sjgov.org . The method of Contractor Selection has not been Determined at this time. ** RFP date info : The following information must be placed in the lower left corner of the sealed envelope/package containing the proposal: Statement of Qualifications & Technical Proposals ESCALON-BELLOTA ROAD BRIDGE 29C-476 REPLACEMENT PROJECT

Conceptual

Bridges / Tunnels

$600,000.00

Public - County

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
438
Active Projects
197
Bidding Soon
3,269
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2027

Project location map

Escalon-Bellota Rd, Farmington, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.