BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 18, 2026 at 8:00 PM

Updated August 23, 2026

Demolition, site work, paving and new construction of a bridge / tunnel in Farmington, California. Completed plans call for the demolition of a bridge / tunnel.

Stanislaus County Public Works is the lead agency for the Milton Road over Hoods Creek Bridge Replacement project and is soliciting proposals from qualified consultants for the proposed work identified in the project description and scope of work in this request for proposals. The selection committee will evaluate all proposals submitted. The selection considerations for evaluating the proposal are included in this request following the "Proposal Requirements." EXISTING STATE BRIDGE No. 38C-0232 NEW BRIDGE No. 38C0367 The existing Milton Road Bridge over Hood Creek is a 123-foot long six span slab bridge built in 1931 that is now considered functionally obsolete by Caltrans under the Federal Highway Administration (FHWA) prescribed inspection criteria. The Project is needed to meet current structural design standards to provide improved safety and operations on the facility. The Project will include replacement of the existing bridge with a new two-lane cast-inplace slab bridge on the same existing alignment. No detours or road closures of Milton Road will be used, instead a temporary shoe fly road will be built to the west side of the existing bridge. In addition, due to Hood Creek having both summertime and wintertime flows, a temporary creek diversion system is required within the shoe fly.. The new bridge will have two spans over Hood Creek with the center pier made of 24-inch diameter CISS piles . The existing bridge and abutments will be removed from Hood Creek If you wish to be considered for this work, please submit all required information to Stanislaus County Department of Public Works, Attention: Gary Mohler at 1716 Morgan Road, Modesto, CA 95358. Estimated Stanislaus County Board of Supervisors Consideration of Approval of Contract (estimated ) executed on Tuesday, October 13th, 2026; The working days on this project are 165. Question Deadline 07/16/2026

GC Bidding

$5,765,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
459
Active Projects
192
Bidding Soon
2,970
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2026

March 12, 2027

Project location map

Milton Rd, Farmington, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.