Published August 18, 2026 at 8:00 PM
Updated August 23, 2026
Demolition, site work, paving and new construction of a bridge / tunnel in Farmington, California. Completed plans call for the demolition of a bridge / tunnel.
Stanislaus County Public Works is the lead agency for the Milton Road over Hoods Creek Bridge Replacement project and is soliciting proposals from qualified consultants for the proposed work identified in the project description and scope of work in this request for proposals. The selection committee will evaluate all proposals submitted. The selection considerations for evaluating the proposal are included in this request following the "Proposal Requirements." EXISTING STATE BRIDGE No. 38C-0232 NEW BRIDGE No. 38C0367 The existing Milton Road Bridge over Hood Creek is a 123-foot long six span slab bridge built in 1931 that is now considered functionally obsolete by Caltrans under the Federal Highway Administration (FHWA) prescribed inspection criteria. The Project is needed to meet current structural design standards to provide improved safety and operations on the facility. The Project will include replacement of the existing bridge with a new two-lane cast-inplace slab bridge on the same existing alignment. No detours or road closures of Milton Road will be used, instead a temporary shoe fly road will be built to the west side of the existing bridge. In addition, due to Hood Creek having both summertime and wintertime flows, a temporary creek diversion system is required within the shoe fly.. The new bridge will have two spans over Hood Creek with the center pier made of 24-inch diameter CISS piles . The existing bridge and abutments will be removed from Hood Creek If you wish to be considered for this work, please submit all required information to Stanislaus County Department of Public Works, Attention: Gary Mohler at 1716 Morgan Road, Modesto, CA 95358. Estimated Stanislaus County Board of Supervisors Consideration of Approval of Contract (estimated ) executed on Tuesday, October 13th, 2026; The working days on this project are 165. Question Deadline 07/16/2026
GC Bidding
$5,765,000.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 26, 2026
March 12, 2027
Milton Rd, Farmington, CA
Related To This Project
Farmington, CA
Bid Date: Aug 26 2026
Farmington, CA
Bid Date: Aug 26 2026
Farmington, CA
Bid Date: May 07 2026
Farmington, CA
--
Farmington, CA
--
Farmington, CA
Bid Date: Sep 17 2024
Farmington, CA
Bid Date: Nov 06 2025
Farmington, CA
Bid Date: Feb 23 2023
West Sacramento, CA
Bid Date: Jul 28 2026
McKinleyville, CA
Bid Date: Aug 21 2026
Soledad, CA
Bid Date: Jul 31 2026
Cabazon, CA
--
Highland, CA
Bid Date: Jul 30 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.