BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 20, 2025 at 8:00 PM

Updated October 21, 2025

Site work and paving for a mixed-use development in Santa Rosa, California. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of October 20, 2025, bids received were rejected. No definite date for the rebid.** Pursuant to California Labor Code Section 1770 and following, Contractor shall pay not less than the prevailing wage rate. Pursuant to Labor Code Section 1773, the general prevailing rate of wages has been determined by the Director of the State Department of Industrial Relations ("Director"). Prevailing wage is required on all public works jobs over $1,000. Question Deadline 09/16/2025 at 5:00 PM PT - All questions pertaining to the Bid are to be submitted to the County's Project Manager via email to: SPI-Capital-Projects@sonomacounty.gov. Questions will not be accepted by phone and must be in writing. After the deadline no further questions will be accepted. The County will supply responses by 5:00pm, Tuesday, September 30, 2025 through the online. For questions regarding the Supplier Portal, email supplier-desk@sonomacounty.gov. It is incumbent upon all interested parties to check for any changes, including updates or addenda, by logging into the County's Supplier Portal and reviewing the event. For questions regarding the Supplier Portal please email the EFS Supplier Desk at supplier-desk@sonoma-county.org. Evet Pre bid meeting Description: Bidders must attend Pre-Bid Conference and Site Visit and sign an Attendance Roster as a condition to bid. The Pre-Bid Conference and Site Visit will last approximately one and one half (1 1/2 ) hours. DESCRIPTION AND LOCATION OF THE WORK. The Work consists of construction of County’s ADA Signalized Intersections, Batch 5, at Arnold Drive at Mission Drive and, Arnold Drive at Watmaugh Road, Sonoma, California. The work includes, but is not limited to, the construction of curb ramps, sidewalks, curbs and pedestrian push button devices.

Final Planning

Roads / Highways

$300,000.00

Public - County

Paving, Site Work

11

13

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
319
Active Projects
117
Bidding Soon
2,468
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2025

April 20, 2026

Project location map

Multiple Locations, Santa Rosa, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.