Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 20, 2025 at 8:00 PM
Updated September 21, 2025
Site work and paving for a road / highway in Tinley Park, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Project consists of crack sealing and application of seal coat as well as parking lot striping. The Tinley Park- Park District will award the Contract to the lowest most responsible and responsive Bidder, as determined by the Park District. After bid opening, no bids may be withdrawn and all bids shall remain firm for ninety (90) days. Bids shall not include federal excise tax or state sales tax for materials and equipment to be incorporated in, or fully consumed in the performance of, the Work. An Exemption Certificate will be furnished by the Tinley Park- Park District on request of the Bidder, for use in connection with this Project only. The Work of this Project is subject to the Illinois Prevailing Wage Act, 820 ILCS 130/0.01 et seq. A prevailing wage determination has been made by the Park District, which is the same as that determined by the Illinois Department of Labor for public works projects in Cook County. The Contract entered into for the Work will be drawn in compliance with said law and proposals should be prepared accordingly and provide for payment of all laborers, workmen, and mechanics needed to perform the Work at no less than the prevailing rate of wages (including the prevailing rate for legal holiday and overtime work in and as applicable) for each craft, type of worker, or mechanic. This project is subject to the Employment of Illinois Workers on Public Works Act which requires employment of 90 percent of Illinois workers that applies to all labor on public works projects or improvements, including projects involving the clean-up and on-site disposal of hazardous waste. All bid proposals must be accompanied by a bid bond or bank cashier's check payable to the Tinley Park- Park District for five percent (5%) of the amount of the bid as provided in the Instructions to Bidders. No proposals or bids will be considered unless accompanied by such bond or check. The Contractor selected will also be required to comply with all applicable federal, state and local laws, rules, regulations and executive orders including but not limited to those pertaining to equal employment opportunity. Ashley Rubino Secretary. The contract will be considered for award at an upcoming scheduled meeting of the Park Board of Commissioners. The work consists of but is not limited to crack filling, sealcoating, and parking lot striping. The Tinley Park-Park District Board of Park Commissioners reserves the right to waive all technicalities, to accept or reject any or all bids, to accept only portions of a proposal and reject the remainder without disclosure for any reason. Failure to make such a disclosure will not result in accrual of any right, claim or cause of action by any Bidder against the Tinley Park- Park District. Est. Completion Date : Nov. 28, 2025.
Post-Bid
Roads / Highways
$500,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 19, 2025
October 20, 2025
Multiple Locations, Tinley Park, IL
Related To This Project
Tinley Park, IL
Bid Date: Oct 03 2025
Tinley Park, IL
Bid Date: Oct 23 2025
Tinley Park, IL
Bid Date: Nov 14 2025
Tinley Park, IL
Bid Date: Sep 09 2025
Tinley Park, IL
Bid Date: Sep 09 2025
Tinley Park, IL
Bid Date: Sep 02 2025
Tinley Park, IL
Bid Date: Sep 26 2025
Tinley Park, IL
--
Tinley Park, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
