BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 9, 2025 at 8:00 PM

Updated October 10, 2025

Renovation of a mixed-use development in Upper Lake, California. Completed plans call for the renovation of a elderly care / assisted living facility; library; and municipal facility.

Project No - 435-24F, 435-24D-06 Project Work: The Project consists of 1. Removal, disposal, replacement and installation of a modified bitumen roof system atall five locations., Replace all blocking., Replace all coping and flashing., Replace expansion joints 2. With the exception of the OWNER FURNISHED PRODUCTS identified in Section 0164 00 of the Specifications, the Contractor shall furnish all labor, materials, parts, equipment, tools, supervision, services, transportation, waste disposal, facilities and other required items necessary to complete the following work in strict accordance with all of the Contract Documents. 3. The County (Owner) will provide roofing materials specifically listed in Section 01 64 00 of the specification section in the quantities listed only. The Contractor shall be financially responsible for the materials that are not supplied by the County. Roofing contractor is required to purchase any necessary additional materials at roofing contractor's cost and should be included in bid price. Contractor is responsible to coordinate ordering materials, receive and unload all materials at site, safely stage and load all materials to roof. 4. Permits: The County has secured all required building permit(s) Project Site: 1.Chamber of Commerce (Vista Point) 875 Lakeport Blvd., 2. District Attorney 375 3rd Street, 3. Law Library 175 3rd Street, 4. Veteran's Services 285 N. Main Street, 5. Special Districts Administration 230. N. Main Street, all sites in Lakeport, Ca. 95453. Owner's Representatives: Joseph Cooper Capital Project Manager 333 Second Street Lakeport CA 95453 Ph. 707-262- 1618 Fax. Project Time For Completion The Contractor shall commence and complete work between October 30, 2025, and June 30, 2026. questions regarding plans and specifications, as well as omission, discrepancy, conflict, error, ambiguity or need for interpretation or clarification, shall be submitted no later than 5:00 p.m. on Thursday, September 18, 2025, on the online website. Answers to questions will be issued through official addendum by Wednesday September 24, 2025.

Award

Library

$495,000.00

Public - County

Renovation

40

53

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
53
Bidding Soon
455
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2025

October 30, 2025

Project location map

Multiple Locations, Upper Lake, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.