BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 18, 2025 at 8:00 PM

Updated September 19, 2025

Renovation of a military facility in Fort Bragg, North Carolina. Completed plans call for the renovation of a military facility.

The contractor shall furnish all labor, equipment, transportation, tools, supervision, and materials necessary to replace carpet in offices located at Building 2-1731, Fort Bragg, North Carolina. The work must be performed in accordance with the Revised Statement of Work dated 08 SEP 2025 and the Revised Office Dimensions. All changes are reflected in Section J, Attachment 01 and Attachment G. Contractors must acknowledge Amendment P00001 and respond accordingly. A site visit was scheduled for 10:00 AM EDT on 8 SEP 2025, with RSVP required by 4:00 PM EDT on 4 SEP 2025. Questions must be submitted via email by 12:00 PM EDT on 10 SEP 2025, and quotes are due by 4:00 PM EDT on 17 SEP 2025. **Location:** Building 2-1731, Fort Bragg, North Carolina 28310, United States All question shall be emailed to Paul Ciabotti at paul.m.ciabotti.mil@army.mil and Philhwa Kim at philhwa.kim.mil@army. mil no later than 12:00 PM, noon, Eastern Daylight Time (EDT) on 10 SEP 2025. Late questions may not be accepted or considered. All questions and answers will be combined on a single document which will be made available to all qualified offerors, on a non-attribution basis. Verbal questions will not be answered. The contractor shall begin performance within 10 calendar days and complete it within 30 calendar days Estimated Range $41,250 - $86,250 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Q AND A 4PM, 10 SEP 2025 All question shall be emailed to Paul Ciabotti at paul.m.ciabotti.mil@army.mil and Philhwa Kim at philhwa.kim.mil@army. mil no later than 4:00 PM, noon, Eastern Daylight Time (EDT) on 10 SEP 2025. Late questions may not be accepted or considered. All questions and answers will be combined on a single document which will be made available to all qualified offerors, on a non-attribution basis. Verbal questions will not be answered

Post-Bid

Military

$86,250.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
250
Active Projects
121
Bidding Soon
1,726
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2025

September 29, 2025

Project location map

2175 Rock Merritt Ave, Fort Bragg, NC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.