BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 3, 2025 at 7:00 PM

Updated December 4, 2025

Renovation of a playground / park / athletic field in Somerset, Massachusetts. Completed plans call for the renovation of a playground / park / athletic field.

Installation of Fitness Equipment Somerset Pottersville Field - 212 Washington Ave Somerset, Massachusetts Scope of Services Requested: Fitness Court (R) Installation Description The work under this contract shall include installation of the Fitness Court (R) designed by National Fitness Campaign (NFC). The installation should at minimum follow all specifications and dimensions set forth by NFC. A complete set of instruction documents is included and required to be followed. Installation of Outdoor Fitness Tile: Confirming that the existing concrete slab is suitable for tile adhesive requirements. Understanding and following all of the adhesive application specifications especially as it related to environmental conditions at the time of installation. Tile will be provided with either a 1 part or 2 part epoxy. Tooling requirements and tile installation techniques to prevent tile from bowing and lifting. 1122 SF of tile - Fitness Court (R) 2244 SF of tile - Fitness Court (R) Studio Assembly of Fitness Floor Wall: Correct accuracy of installing the anchor bolts to allow for a precision puzzle fit assembly of the Fitness Wall. Knowledge of and tooling required to install wall skin panels utilizing rivet attachments. Following all NFC Installation instructions to ensure correct attachment of the footstrip paneling. Installation and anchoring of all Fitness Court(R) floor equipment provided by the Town, including: Installation of (6) Plyo Boxes Installation of (8) Lunge Steps Installation of (2) Bend Stations Installation of (2) Sets of Row Stands fitness court(R)installation site partner requirements site partner to provide the following as part of the fitness court (R) assembly process, unless noted otherwise. slab to be swept and cleaned by the site partner prior to the arrival of the installation crew. all power washing should happen 48 hours prior to the installation team's arrival. the installation team will sweep again prior to gluing down any tile. site partner and installation team to confirm exact orientation of fitness court wall relative to the concrete slab prior to the beginning of work. jobsite fencing: caution tape & tall safety cones or snow barrier type fencing (preferred) or chain link construction fencing (if needed for added site security & safety) garbage & recycling off haul: off haul of / recycling of all waste, cardboard, pallets and crate(s) the installation team will clean up the jobsite daily. storage of graphics & adhesive: safe, environmentally conditioned storage of graphics & adhesive adhesive note: all of the adhesives have an expiration date. any fitness court stored longer than 9 months from the date of receipt from nfc will need new adhesive per manufacturer's requirements. this applies to the tile adhesives (4-day minimum ship time) and the epoxy adhesives. (readily available at local hardware stores.) please consult with your nfc project manager to discuss and coordinate the delivery of new adhesive if needed. Weather / Temperature: Site Partner to coordinate installation schedule in alignment with required environmental conditions. Ideal temperature ranges between 50 degrees and 85 degrees for a minimum of 24 hours with a relative humidity between 40% and 80%. TILE FLOOR MUST REMAIN DRY AND ABOVE 50 DEGREES FOR A 24 HOUR PERIOD FROM TIME OF INSTALLATION. Site Staging & Security: Installer to coordinate overnight storage and security for any items left onsite. Fitness Court Storage It is preferred, where possible, that all items are delivered prior to arrival so that the installation crews can shift from one task to the other without delay in case of sudden weather changes etc. The Town will coordinate delivery of equipment with installer including the items listed as follows; (21/2) Pallets of Tile including border tile per Fitness Court Floor o Client to confirm color of tile (6) Buckets of Sports Tile Adhesive per Fitness Court Floor (2) Wooden Crate: Contains wall skins and brackets and misc. Equipment & hardware (1) Pallet containing (15) Wall Frames (1) Pallet containing (2) Bend Stations (2) Pallets containing total of (6) Plyo boxes and (8) Lunge Stations (1) Pallets containing (4) Row Stands (1) Pallets containing (2) Push Ladders Installation of outdoor fitness equipment at Somerset Potterville Field

Award

Playgrounds / Parks / Athletic Fields

$35,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
3
Bidding Soon
1,950
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2025

October 27, 2025

Project location map

212 Washington Ave, Somerset, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.