Published September 12, 2025 at 8:00 PM

Updated September 19, 2025

Demolition and site work for a municipal facility in New Market, Virginia. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.

This project is intended for the Massanutten Visitor Center building demolition within New Market, Virginia. The Lee Ranger district is looking for a contractor to dispose of the Massanutten Visitor Center. The Visitor Center is in New Market, Virginia along Interstate 211. This building was acquired by the U.S. Forest Service back in 1968 but has since been permanently closed. Due to the high cost of repairs the agency has decided to permanently dispose of the building. Describe the specific tasks or work the contractor must perform. Provide direction on any specific methodologies. o The description of task requirements will depend on the approach that is selected to describe the required effort. o For a level-of-effort SOW, identify all tasks that must be performed and the hours to be devoted to each task. o For a detailed statement of work, describe how the service must be accomplished. It may include precise measurements, tolerances, materials, quality control requirements, and other government requirements that control the processes of the contractor. o Describe the requirements in a way that permits the contractor personnel to perform the service without direct government supervision. Contractor personnel must not be subject to the supervision and control usually prevailing between the government and its employees. For example, a SOW may permit the government to approve key personnel but must not permit the government to approve all personnel performing the service. The SOW should also not include words (e.g., "use methods directed by the Contracting Officer's Representative (COR)") that appear to indicate the government is managing day-to-day operations. Other items to consider: o Specify requirements clearly so all readers can understand the content. o Reference only the absolute minimum applicable specifications and standards needed. o Tailor specifications and other documents. o Separate general information from direction. Insert Technical Requirements / Tasks Here Site Conditions - Building to be demolished will be vacated and their use discontinued at start of work. - Buildings immediately adjacent to the demolition area will be occupied. Conduct building demolition so operations of occupied buildings will not be disrupted. Materials Ownership Unless otherwise indicated, demolition waste becomes property of Contractor.

Post-Bid

Municipal

$70,000.00

Public - Federal

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
75
Bidding Soon
1,397
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 18, 2025

October 20, 2025

Project location map

3220 E Lee Hwy, New Market, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.