BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 7, 2025 at 8:00 PM

Updated October 8, 2025

Site work for a water / sewer project in Hamilton, Ontario. Completed plans call for site work for a water / sewer project.

The Hamilton Region Conservation Authority (HRCA) is an environmental agency, which operates as an independent corporation in a non-union environment. It operates a variety of conservation areas, totaling about 4400 hectares within its 500 square kilometer watershed in the Hamilton Area. One of the areas that the HCA operates is the vicinity of the Mineral Springs Detention Facility located on the Sulphur Creek crossing with Martin Road immediately south of the 380 Martin Road driveway in Ancaster. In 2021, a visual inspection by a dam engineering consultant identified that the detention facility embankment experiences slope slump issues due to small, frequent rain event water ponding at the low point of the concave crest. It was concluded that the combination of saturated soils and concentrated surface runoff during frequent rain events led to soil washout and displacement of riprap near the slope crest. During HCA's monthly inspections in 2024, staff observed that the extent of the slump remained. To improve the distribution of sheet flow away from the embankment crest and address the identified slope instability, Water's Edge Environmental Solutions Team Ltd. prepared a regrading and repair design. For any questions regarding this project, please contact: Rebecca Bar, Project Engineer Telephone: (905) 525-2181 x156 Email: rbar@conservationhamilton.ca Site visit location: Martin Road (Parking lot at end of paved section) 43.220674, -80.009824, Ancaster, Ontario L9G 5C3 Canada. Documents are available at https://www.biddingo.com/dashboard/bid/1/41180097/40766528/verification Question Deadline 09/26/2025 at 11:00 AM ET Rebecca Bar Project Engineer Hamilton Conservation Authority Telephone: (905) 525-2181 x156 Email: rbar@conservationhamilton.ca OR Ed Gazendam, M.Eng., P.Eng. President Waters Edge Environmental Solutions Team Telephone: (519) 651-2390 Email: ed@watersedge-est.ca

Post-Bid

Water / Sewer

$100,000.00

Public - County

Site Work

7

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
482
Active Projects
235
Bidding Soon
4,704
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2025

November 3, 2025

Project location map

380 Martin Rd, Hamilton, ON

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.