This is a service / maintenance or supply contract in Fresno, California. Contact the soliciting agency for additional information.
Scope of Work: The project will require five separate tasks as described below. The Provider will be required to provide unit costs for each task. Work will be performed on fields that have recently been leveled with irrigation turnouts and other features. The Provider is tasked with completing the scope of work while protecting the existing irrigation turnouts and features. Ripping. Ripping to a minimum depth of 24" with a spacing of approximately 18". Multiple passes may be required to reach the minimum depth and the unit rate for this work will be per pass per acre. The Provider will be required to supply all equipment, labor, fuel, and other appurtenances necessary to complete this work. Heavy Disc. A heavy disc pass may be required to breakup weeds or soil clods generated by the ripping effort. A minimum disc size of 28" will be required for this effort. The unit rate for this work will be per pass per acre. The Provider will be required to supply all equipment, labor, fuel, and other appurtenances necessary to complete this work. Finish Disc. A finish disc, stubble disc, optimizer, or similar device may be used to prepare the seed bed. The unit rate for this work will be per pass per acre. The Provider will be required to supply all equipment, labor, fuel, and other appurtenances necessary to complete this work. Land Plane. As necessary to prepare for the check borders, the border sites will be planed prior to the border shaping. The Provider will be required to supply all equipment, labor, fuel, and other appurtenances necessary to complete this work. Border shaping. All fields will be flood irrigated by way of 30 foot checks. Check borders shall be developed on each field approximately 30 feet apart approximately centered on the existing alfalfa valve turnouts. The unit rate for this work will be per acre. The Provider will be required to supply all equipment, labor, fuel, and other appurtenances necessary to complete this work. Planting. All fields will be planted with Jose Tall Wheatgrass by the seed-drill method or a similar approved method. Seed will be provided by the District. The unit rate for this work will be per acre. The Provider will be required to supply all equipment, labor, fuel, and other appurtenances necessary to complete this work. The work will be completed in coordination with other projects in-progress on the site and the District will work with the Provider to schedule the work and prioritize fields to be planted. The District reserves the right to split the work among multiple contractors in order to ensure completion.
Post-Bid
Water / Sewer
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 23, 2025
October 23, 2025
Multiple Locations, Fresno, CA
Related To This Project
Fresno, CA
Bid Date: Oct 02 2025
Fresno, CA
Bid Date: Oct 14 2025
Fresno, CA
Bid Date: Oct 30 2025
Fresno, CA
Bid Date: Oct 10 2025
Fresno, CA
Bid Date: Oct 01 2025
Fresno, CA
Bid Date: Oct 01 2025
Fresno, CA
Bid Date: Sep 30 2025
Fresno, CA
Bid Date: Sep 19 2025
Fresno, CA
Bid Date: Oct 09 2025
Fresno, CA
Bid Date: Sep 25 2025
Fresno, CA
Bid Date: Sep 23 2025
Fresno, CA
Bid Date: Oct 01 2025
Fresno, CA
Bid Date: Oct 09 2025
Fresno, CA
Bid Date: Oct 08 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.