Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 22, 2025 at 8:00 PM
Updated October 23, 2025
Site work for a road / highway in Arroyo Grande, California. Completed plans call for site work for a road / highway.
Replacement of Traffic Guardrails Each bid must be accompanied by cash, a certified or cashier's check, or bidder's bond on the prescribed form and made payable to the City for an amount equal to at least 10 percent of the amount of the Bid, such guaranty to be forfeited should the apparent successful bidder to whom the contract is awarded fail to furnish the required bonds and insurance certificates, and timely enter into the contract with the City. A Sample Construction Contract is attached in Exhibit "B". The security of unsuccessful bidders will be returned by the City no later than sixty (60) says following the date of the award of the contract for the work. Contract time is established as 20 working days. If you have questions regarding this project, please contact Theresa Wren, CIP Manager at (805) 473-5441 or twren@arroyogrande.org. Questions or Requests for Information shall be submitted in writing before September 19, 2025, at 4:00 PM. The City of Arroyo Grande Public Works Department is requesting a price quotation for all labor, materials, equipment, design, and services necessary to repair or replace guardrails as noted at the six locations described above in General Conditions and on the Site Maps in Exhibit A. Site Maps in Exhibit "A" show the six (6) project locations. 1. El Camino Real North of Grand Avenue, north of South County Animal Hospital East side - across from 407 El Camino Real 25 LF repair - start repairs 15 LF from the southernmost end north 25 LF Repairs include 5 new posts and 3 sections of guardrail 2. El Camino Real at Robles Road Northeast side of El Camino Real 80 LF installation (old guardrail already removed) 3. El Camino Real at Hillcrest Drive Northeast side of El Camino Real 80 LF of remove and replace 4. Oak Park Boulevard Southern End of Hwy. 101 Overpass East side of Oak Park Blvd., just north of El Camino Real 65 LF replace wood posts, all other steel and hardware is reusable. 5. 1500 Block of Hillcrest Drive a. North side of Hillcrest, between 1585 Hillcrest and Sierra Dr. 130 LF remove and replace b. Northwest side of Hillcrest, between 1585 Hillcrest Dr. and 1557 Hillcrest Dr. 140 LF remove and replace 6. West Branch Street north of Grand Avenue a. South side, across from between 234 and 268 W. Branch St. 460 LF remove and replace between existing drain inlet to east end Written Questions Due September 19th @ 4:00 pm Begin Work November 3rd
Award
Roads / Highways
$65,535.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 30, 2025
November 3, 2025
Multiple Locations, Arroyo Grande, CA
Related To This Project
Arroyo Grande, CA
Bid Date: Dec 05 2025
Arroyo Grande, CA
Bid Date: Oct 07 2025
Arroyo Grande, CA
Bid Date: Nov 21 2025
Arroyo Grande, CA
Bid Date: Dec 04 2025
Arroyo Grande, CA
--
Arroyo Grande, CA
Bid Date: Sep 22 2025
Arroyo Grande, CA
Bid Date: Sep 25 2025
Arroyo Grande, CA
Bid Date: Sep 05 2025
Arroyo Grande, CA
Bid Date: Aug 28 2025
Arroyo Grande, CA
--
Arroyo Grande, CA
--
Arroyo Grande, CA
--
Arroyo Grande, CA
Bid Date: Oct 30 2025
Arroyo Grande, CA
Bid Date: Jun 24 2025
Arroyo Grande, CA
Bid Date: May 27 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
