Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 27, 2025 at 8:00 PM
Updated October 28, 2025
Site work for a water / sewer project in Winnipeg, Manitoba. Completed plans call for site work for a water / sewer project.
Reference Number 0000302241 Pricing Lump sum Question Deadline 09/23/2025 at 9:00 AM CT D3.1 The Work to be done under the Contract shall consist of the construction of new stormwater conveyance infrastructure from Parcel B of the NEWPCC site to the John Black LDS near Main Street. This infrastructure includes an LDS trunk from Parcel B to Parcel C, a stormwater retention pond located on Parcel C, an LDS trunk from Parcel C connecting to the existing John Black LDS near Main Street, manholes and appurtenances in accordance with the applicable Specifications and Drawings. Additionally, removal of impacted soils within the proposed LDS alignment is included. D3.2 The major components of the Work are as follows: (a) Installation of approximately 153 m of twin 1350 mm land drainage sewers from Parcel B to Parcel C. (b) Installation of approximately 873 m of 900 mm land drainage sewer between the stormwater pond and Main Street near Foley Avenue. (c) Installation of approximately 79 m of 1800 mm land drainage sewer west of Main Street from Foley Avenue to John Black Avenue. (d) Trenchless construction of approximately 42 m of 900 mm land drainage sewer in a 1200 mm steel casing undercrossing the CPKC railway in the CPT ROW. (e) Connection of the new land drainage sewer to the existing capped 900 mm LDS from the John Black Outfall. (f) Excavation of stormwater detention pond (Dry Pond), fitted with inlet/outlet structures and anti-seepage collars. (g) Off site disposal of approximately 4050 tonnes of impacted soil stockpiles in the CPT ROW. (h) (Provisional Item) Trenchless construction of approximately 55 m of 1050 mm land drainage sewer undercrossing the CPKC railway from Parcel A to the 1350 mm LDS on Parcel B. The Bidder shall include in their Bid Submission bid security in the form of a digital bid bond, in the amount of at least ten percent (10%) of the Total Bid Price, and agreement to bond of a company registered to conduct the business of a surety in Manitoba. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
Bid Results
Water / Sewer
$6,517,301.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 23, 2025
November 24, 2025
Multiple Locations, Winnipeg, MB
Related To This Project
Winnipeg, MB
Bid Date: Oct 14 2025
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Sep 29 2025
Winnipeg, MB
Bid Date: Oct 29 2025
Winnipeg, MB
Bid Date: Oct 03 2025
Winnipeg, MB
Bid Date: Oct 06 2025
Winnipeg, MB
Bid Date: Oct 21 2025
Winnipeg, MB
Bid Date: Nov 04 2025
Winnipeg, MB
Bid Date: Oct 03 2025
Winnipeg, MB
Bid Date: Sep 15 2025
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Sep 25 2025
Winnipeg, MB
Bid Date: Sep 26 2025
Winnipeg, MB
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
