Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 21, 2025 at 8:00 PM
Updated October 22, 2025
Renovation of a water / sewer project in Fargo, North Dakota. Completed plans call for the renovation of a water / sewer project.
The City of Fargo Water Treatment Plant is requesting proposals from qualified contractors for the installation of a hot water system capable of delivering water at 104F and a flow rate of 100 gallons per minute (GPM). This temperature has been identified as optimal for chemical mixing processes. Please contact Bonfire at Support@GoBonfire.com for technical questions related to your submission. The proposed system will include a new closed-loop pump, heat exchanger, and mixing valve to generate and supply the required hot water. An existing RO flush pump and boiler system will be used to reroute water from the existing 6,000-gallon holding tanks through the new heat exchanger. The system will be designed to supply hot water to both the 800-gallon batch mixing tanks and the 6,000-gallon holding tanks Furnish and install Boiler Recirc Pump Furnish and install Plate and Frame Heat Exchanger Furnish and install isolation valves on equipment and expansion joints on pump Furnish and install all RO piping - CPVC Sch 80 o System RO Pump to HX (Reworking header piping) o HX to RO Heated Tanks (2) o HX to 1 st Floor Mixing Tanks (2) HX to Ultra Filtration Header (1) Furnish and install Heating hot water piping from secondary loop in boiler room to HX VFD included - Electrical by others Owner to furnish all control valves (2) Owner to furnish and install all control wiring and programming All drains and vents included All concrete pads for equipment included All core drilling for piping and fire proofing included Insulation of piping on Heating Hot Water system included Perform startup and check out of system to ensure working correctly All specified products shall be installed in accordance with all manufacturers instructions and requirements.
Award
Water / Sewer
$103,975.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 2, 2025
November 3, 2025
Multiple Locations, Fargo, ND
Related To This Project
Fargo, ND
Bid Date: Oct 03 2025
Fargo, ND
Bid Date: Oct 10 2025
Fargo, ND
--
Fargo, ND
Bid Date: Oct 22 2025
Fargo, ND
Bid Date: Oct 22 2025
Fargo, ND
Bid Date: Oct 08 2025
Fargo, ND
Bid Date: Oct 23 2025
Fargo, ND
Bid Date: Sep 25 2025
Fargo, ND
Bid Date: Sep 30 2025
Fargo, ND
Bid Date: Sep 23 2025
Fargo, ND
--
Fargo, ND
Bid Date: Sep 24 2025
Fargo, ND
Bid Date: Sep 05 2025
Fargo, ND
Bid Date: Sep 11 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
