Site work and paving for a sidewalk / parking lot in Lake Arrowhead, California. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
**As of October 21, 2025 project has been canceled. As of this time it is unknown if an when project will rebid. Fire Station No. 26 Covered Parking Installation. Project no- 24005463.00 Question Deadline 10/03/2025 All technical questions to be submitted to the Project Manager in writing via email at Travis.williford@pfm.sbcounty.gov SCOPE OF WORK Contractor will furnish all materials, labor, tools, equipment, apparatus, facilities, transportation, construction, landscaping, clean-up, and all other construction services of any type necessary to complete all Work in strict conformity with the Contract Documents. Except with regard to any material to be provided and/or installed by County, Contractor shall fully commission and turn over a complete operational and fully functional Project to County. Without limiting the generality of this Section, Contractor shall provide the following Work and services: a. Contractor shall provide, install and complete as specified and pay for all labor, materials and equipment, tools, supplies, construction equipment and machinery, construction, start-up and testing, utilities, transportation, and other facilities and services (including any temporary materials, equipment, supplies and facilities) necessary for the proper execution and completion of the complete, operational, and fully functional Project, including the permanent interconnection for electricity, natural gas, water supply, and any other utilities and demonstration of fully satisfactory operation of all systems and equipment. The County will pay connection fees directly to the utilities for all permanent water and electrical connections. b. Contractor shall supervise and direct the Work, and shall furnish the services of all supervisors, forepersons, skilled and unskilled labor, and all other personnel necessary to construct the complete, operational, and fully functional Project. Contractor shall provide, manage and organize such personnel as necessary to complete the Work in accordance with all requirements of the Contract Documents
Final Planning
Sidewalks / Parking Lot
$200,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 22, 2025
April 21, 2026
737 Grandview Rd, Lake Arrowhead, CA
Related To This Project
Lake Arrowhead, CA
Bid Date: Dec 09 2025
Lake Arrowhead, CA
--
Lake Arrowhead, CA
Bid Date: Feb 05 2026
Lake Arrowhead, CA
Bid Date: Mar 12 2026
Lake Arrowhead, CA
Bid Date: Sep 04 2025
Lake Arrowhead, CA
Bid Date: Aug 28 2025
Lake Arrowhead, CA
Bid Date: Aug 14 2025
Lake Arrowhead, CA
Bid Date: Jul 18 2025
Lake Arrowhead, CA
Bid Date: Aug 27 2025
Lake Arrowhead, CA
--
Lake Arrowhead, CA
Bid Date: Jul 10 2025
Lake Arrowhead, CA
Bid Date: Apr 30 2025
Lake Arrowhead, CA
Bid Date: Apr 15 2025
Lake Arrowhead, CA
Bid Date: Apr 03 2025
Lake Arrowhead, CA
Bid Date: Feb 28 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.