Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 24, 2025 at 8:00 PM
Updated September 25, 2025
Site work and paving for a mixed-use development in Lake Arrowhead, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
T2N, R3W SECTIONS 17, 20 ,22 & 29 Question Deadline 08/19/2025 at 10:00 AM PT All questions relative to this project prior to the opening of bids shall be directed to the manager of the project: Lake Arrowhead Community Services District PO Box 700, Lake Arrowhead, CA 92352 (USPS) 27307 State Highway 189, Blue Jay, CA 92317 (FedEx, etc.) Project Manager: Scott Schroder Telephone: (909) 336-7136 Fax: (909) 337-6715 E-mail: sschroder@lakearrowheadcsd.com The work consists of providing all materials, labor, tools, equipment, facilities, transportation and incidentals necessary to construct: Adjust 183 existing manholes to finished grade of pavement surface using District supplied manhole covers and ring sets (Pamrex D400 Security Manhole) per detail shown on title sheet of plans. Contractor shall dip manhole and record distance between the invert elevation and rim elevation Additionally, adjust 20 existing cleanouts to finished grade of pavement surface using existing cleanout covers and ring sets. Cleanouts vary in depth 1' to 4'. The site of the work is located in: Lake Arrowhead, California. The site address is: Various sites within Tracts 51, 56, 59, 58, 2492, 7201, 7514, 9790, AD3. ONLY REGISTERED PLANHOLDERS WILL RECEIVE ADDENDA TO THE CONTRACT DOCUMENTS. BIDDERS SHALL NOT BE RELIEVED OF BIDS DUE TO THE FAILURE TO REGISTER OR RECEIVE ADDENDA. BIDDERS ASSUME ALL RISKS OF SUBMITTING BIDS WITHOUT REGISTERING, INCLUDING BUT NOT LIMITED TO THE RISK OF FORFEITURE OF THE BID SECURITY AND THE RISK THAT THE BID WILL BE DEEMED NON-RESPONSIVE. To offset the District's administrative costs, there shall be a registration fee of $100 or 50% of the cost of the plans and/or specifications, whichever is less. Registration will not be effective unless and until the registration fee is paid. The registration fee will be waived for online who purchase plans directly from the District. The Contractor or any subcontractor performing part of said work shall strictly adhere to all provisions of the Labor Code, including, but not limited to, minimum wages, work days, non discrimination, apprentices, maintenance and availability of accurate payroll records and any other matters required under all Federal, State and local laws related to labor. The award of the Contract shall be made to the lowest responsive responsible bidder as determined from the BASE BID ALONE. All prospective bidders are hereby alerted that a waiting period of up to ninety (90) calendar days from time of bid opening may be required before proceedings are completed and written Notice of Award is made. Bidders shall assume full responsibility for the effect of the waiting period delay on the bid price and make certain the time period is stated in and does not restrict their bid guarantee bond. See part 10.0, "Bid Guarantee" herein. In accordance with Bidding and Contract Requirements, Section B - Instructions to Bidders, Part 20.0, "Execution of Contract", the Contractor shall execute the Contract within ten (10) working days after he has received the Notice of Award and Contract forms from the District. Per General Conditions, Section B - Preliminary Matters, the Contractor will be required to furnish with the Contract a performance bond in the amount of one hundred percent (100%) on the aggregate amount of the bid, and a labor and material bond in the amount of one hundred percent (100%) of the bid. The Contractor shall also furnish certificate(s) of insurance evidencing that all insurance coverage, along with applicable endorsements as required by the specifications, has been so secured. A warranty bond shall be furnished by the Contractor upon completion of the work for maintenance and guarantee of all work. The warranty bond can be furnished by an extension of the faithful performance bond after completion of the work. All bids shall be accompanied by a cashier's or certified check, payable to the order of the District (Lake Arrowhead Community Services District), amounting to ten percent (10%) of the bid, or by a bond in said amount and payable to said District, signed by the bidder and a Corporate Surety, or by the bidder and two sureties who shall justify before any officer, competent to administer an oath, in double said amount and over and above all statutory exemption. Said check shall be forfeited or said bond shall become payable to said District in case the bidder depositing the same does not, within ten (10) calendar days after written notice, sign the Contract. Additional bond forms are available at the District office. All work shall be completed within Ninety (90) calendar days after the date of Contract Notice to Proceed by the District. After all documents, bonds, and required support materials have been submitted as required by the project specifications, the District will issue a Notice to Proceed giving the Contractor ten (10) working days to start. This Notice to Proceed shall be delivered to the Contractor electronically, deposited in the United States mail or provided to the Contractor at the preconstruction conference at the latest. A preconstruction conference will be convened by the District regarding the project. It has been determined that the damage sustained by the District as a result of Contractor's breach of his agreement to complete work within the time agreed upon may result in damages of $400.00 per calendar day. As described in the Special Conditions, Part 11.0, "Liquidated Damages", are AS PART OF THIS NOTICE DECLARED TO THE CONTRACTOR. Further, by SUBMISSION OF A BID BY THE CONTRACTOR TO THE DISTRICT TO PERFORM THE WORK, THE CONTRACTOR DECLARES THAT HE HAS CONSIDERED THE AMOUNT OF SAID LIQUIDATED DAMAGES AND that he has determined, after specific evaluation thereof, either independently or in connection with the District, that the amount of such liquidated damages is fair and reasonable and acceptable under the circumstances. Doc note: Copies of the plans and specifications will be mailed upon request for an additional $10.00 each to cover handling and mailing. To the extent required by Section 20103.7 of the Public Contract Code, upon request, the District will provide an electronic copy of the Contract Documents at no charge to a contractor plan room service. Prospective bidders who obtain a copy through a plan room, or by other means, must register with the District in order to be added to the online list and receive addenda to the Bid or Contract Documents. In accordance with Bidding and Contract Requirements, Section B - Instructions to Bidders, Part 16.0 "Rejection or Award of Bids", the District hereby reserves the right to act in the best interest of the District by rejecting any or all bids and/or to waive any irregularity in the bids.
Award
Water / Sewer
$288,821.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 28, 2025
September 29, 2025
Multiple Locations, Lake Arrowhead, CA
Related To This Project
Lake Arrowhead, CA
Bid Date: Sep 04 2025
Lake Arrowhead, CA
Bid Date: Oct 22 2025
Lake Arrowhead, CA
Bid Date: Dec 09 2025
Lake Arrowhead, CA
--
Lake Arrowhead, CA
--
Lake Arrowhead, CA
Bid Date: Feb 05 2026
Lake Arrowhead, CA
Bid Date: Aug 14 2025
Lake Arrowhead, CA
Bid Date: Jul 18 2025
Lake Arrowhead, CA
Bid Date: Aug 27 2025
Lake Arrowhead, CA
--
Lake Arrowhead, CA
Bid Date: Jul 10 2025
Lake Arrowhead, CA
Bid Date: Apr 30 2025
Lake Arrowhead, CA
Bid Date: Apr 15 2025
Lake Arrowhead, CA
Bid Date: Apr 03 2025
Lake Arrowhead, CA
Bid Date: Feb 28 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
