Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 19, 2025 at 8:00 PM
Updated September 20, 2025
Site work, paving and outdoor lighting for a civil project in Portage, Wisconsin. Conceptual plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; and water / sewer project.
Solicitation Id: SW-04 I-39/90/94 modernization project including expanding interstate mainline, reconstructing interchanges, and reconstructing overpasses due to safety and operational concerns. The needs of the project include traffic demands, safety needs, bridge condition, pavement condition, and corridor resiliency. Preliminary and final design of improvements to one segment of the I-39/90/94 majors project (Richards Road to Columbia/Sauk County Line). Project also includes work on I-39 towards the city of Portage. Design of I-39/90/94 from Richards Road to Columbia/Sauk County line. Design includes modernization and expansion plans for I-39/90/94 based on the EIS and includes the reconstruction of a system-to-system interchange, standard interchanges, and overpasses. Improvements includes raising the interstate and a floodplain mapping revision (CLOMR/LOMR). Deliverables include design from study to PS&E. Solicitation includes, but is not limited to, the completion of roadway/structure plans, DSR, TMP, TPP, estimates, staging, PI, geotechnical, PDR, survey, stormwater, ENV documentation and permitting, agency coordination, signal/lighting plans, local government coordination, utility, and transparency services. Project duration shown is for the 1st contract (design of Cascade Mtn Rd overpass); additional contracts may be awarded from this solicitation. Firms selected for this solicitation, prime/joint venture (P/JV), may not be selected as a P/JV for corridor continuity or program controls solicitations. Consultant firms hired by a municipality as a contracted municipal engineer may not compete for contracts that WisDOT is a party to that impact the municipality per FDM 8-5-3.4. As the project progresses, key staff will need to attend meetings 1 or 2 days a week in the Madison office. DBE goal: DBE goal in $ 50000.00 Anticipated Project Start Date: 07/01/2026 Anticipated Project Completion Date: 11/01/2031 The Method of Contractor Selection Has Not Been Determined at This Time. WIDOT - RFP Engineering - Wisconsin Dells - Portage - IH 39N
Conceptual
Roads / Highways
$45,000,000.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
