BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 19, 2025 at 8:00 PM

Updated September 20, 2025

Site work, paving and outdoor lighting for a civil project in Portage, Wisconsin. Conceptual plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; and water / sewer project.

Solicitation Id: SW-04 I-39/90/94 modernization project including expanding interstate mainline, reconstructing interchanges, and reconstructing overpasses due to safety and operational concerns. The needs of the project include traffic demands, safety needs, bridge condition, pavement condition, and corridor resiliency. Preliminary and final design of improvements to one segment of the I-39/90/94 majors project (Richards Road to Columbia/Sauk County Line). Project also includes work on I-39 towards the city of Portage. Design of I-39/90/94 from Richards Road to Columbia/Sauk County line. Design includes modernization and expansion plans for I-39/90/94 based on the EIS and includes the reconstruction of a system-to-system interchange, standard interchanges, and overpasses. Improvements includes raising the interstate and a floodplain mapping revision (CLOMR/LOMR). Deliverables include design from study to PS&E. Solicitation includes, but is not limited to, the completion of roadway/structure plans, DSR, TMP, TPP, estimates, staging, PI, geotechnical, PDR, survey, stormwater, ENV documentation and permitting, agency coordination, signal/lighting plans, local government coordination, utility, and transparency services. Project duration shown is for the 1st contract (design of Cascade Mtn Rd overpass); additional contracts may be awarded from this solicitation. Firms selected for this solicitation, prime/joint venture (P/JV), may not be selected as a P/JV for corridor continuity or program controls solicitations. Consultant firms hired by a municipality as a contracted municipal engineer may not compete for contracts that WisDOT is a party to that impact the municipality per FDM 8-5-3.4. As the project progresses, key staff will need to attend meetings 1 or 2 days a week in the Madison office. DBE goal: DBE goal in $ 50000.00 Anticipated Project Start Date: 07/01/2026 Anticipated Project Completion Date: 11/01/2031 The Method of Contractor Selection Has Not Been Determined at This Time. WIDOT - RFP Engineering - Wisconsin Dells - Portage - IH 39N

Conceptual

Roads / Highways

$45,000,000.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2026

Project location map

I-39, Portage, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.