BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 4, 2025 at 7:00 PM

Updated December 5, 2025

Site work and paving for a mixed-use development in San Bernardino, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of December 4, 2025 , this project has not yet been awarded. The project is expected to be awarded on January 7, 2026.** Online Q&A Yes Q&A Deadline 10/01/2025 4:00 PM (PDT) Scope of Services The Interstate 10 Corridor Freight and Express Lane Project - Contract 2A (Project), located in San Bernardino County, proposes to construct a single express lane with price-managed/tolled facilities in both directions of Interstate 10 (I-10) from approximately I-15 to 0.3 miles east of Sierra Avenue, through the cities of Ontario and , Fontana (including unincorporated area), and the unincorporated communities of Fontana and Bloomington. The Project improvements consist of inside and outside roadway and bridge structures widening within the project limits and will require improvements to local access ramps, freeway system connectors, and bridge structures. These improvements generally include: o Addition of one Express Lane in each direction between the I-10/I-15 Interchange and Sierra Avenue., o Provide five Ingress/Egress (I/E) at-grade access locations to the express lanes: three in the westbound direction and two in the eastbound direction. Two intermediate access locations in each direction are combined I/E. One intermediate access location will provide ingress only in the westbound direction to the east of I-15. Additionally, the existing westbound ingress and eastbound egress locations at Haven Avenue in SBCTA's existing I-10 Express Lane facility will be modified to provide combined I/E access in the eastbound direction only., o Relocate five existing Toll Rate Dynamic Message Signs, and associated sign structures and tolling equipment from existing toll equipment pads., o Coordinate with SBCTA's Toll Service Provider (TSP) for tolling equipment, maintaining operations, and access to existing toll lanes throughout construction., o Separation of general purpose (GP) lanes from the proposed express lanes with a 2-foot wide buffer and surface mounted channelizers within the project limits., o Improve existing auxiliary lanes within the project limits., o Extend the existing acceleration and deceleration lanes in the eastbound direction between Cherry Avenue and Citrus Avenue. The project proposes adding approximately 10 lane miles of new roadway and restriping 13.7 lane miles of existing roadway in each direction. Other project improvements include: o Construct California Highway Patrol (CHP) observation areas., o Replace existing concrete barriers, temporary railings, metal beam guardrails, and metal three- beam barriers with standard safety systems., o Construct maintenance vehicle pullouts (MVP) at various locations., o Modify existing stormwater drainage channels, construction of new drainage facilities, and water quality Best Management Practices (BMPs)., o Construct median lighting at express lane I/E and other select locations along the corridor within the project limits., o Replace freeway overhead sign structures and roadside signs., o Construct retaining walls and sound walls., o Widen seven bridges and reconstruct two bridges. Insert Project Overview here. Bidders are advised that the project estimate is $318,341,400. No DBE goal is required for this project. Written Questions/Approved Equal Request Deadline: WEDNESDAY, OCTOBER 1, 2025 @ 4:00 P.M.

Bid Results

Roads / Highways

$309,274,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

180 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
514
Active Projects
256
Bidding Soon
3,711
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2025

January 19, 2026

Project location map

Multiple Locations, San Bernardino, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.