BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 29, 2025 at 8:00 PM

Updated September 30, 2025

Renovation of an educational facility in Pickerington, Ohio. Conceptual plans call for the renovation of a educational facility.

Risk- diley middle school renovations project Questions may be directed to, and requests for qualifications may be obtained by written request from josh Walsh at josh_walsh@plsd.Us, with a copy to rob, Wein Heimer, business manager, at rob_weinheimer@plsd.Us. The Owner’s estimated total budget for the Guaranteed Maximum Price (including the Cost of the Work, Construction Manager Contingency, Fees, Insurance, Bonding, and General Conditions Costs) is $1,207,000. C. The Owner’s estimated budget for the Cost of the Work for the Project is $925,00

Conceptual

Educational

$1,207,000.00

Public - City

Renovation

18

3

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
234
Active Projects
147
Bidding Soon
1,810
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2025

February 6, 2026

Project location map

750 Preston Trails Dr, Pickerington, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.