Renovation of an industrial development in East Wenatchee, Washington. Completed plans call for the renovation of a 50,940-square-foot, one-story above grade industrial development.

The Chelan Douglas Regional Port Authority (CDRPA) owns the industrial building at 3310 5th Street SE in East Wenatchee, Washington. This building is currently leased to Accor Technology, Inc., a manufacturer of plumbing materials. The building's existing heating, ventilation, and air-conditioning (HVAC) system consists of at least five independent systems of varying sizes, ages, and manufacturing brands. Each system includes indoor air handling units (AHUs) with cooling coils and fans, natural gas or electric heaters, and outdoor condensing units. Some systems feature multiple outdoor compressors and fans. The indoor AHUs are ducted to the exterior to provide ventilation air. The office area HVAC system includes six gas-fired furnaces (F-1 to F-6) paired with direct expansion (DX) condensing units. The production area is served by four gas-fired AHUs (AHU-1 to AHU-4) with DX condensing units. Scope of Work: This project will upgrade the building s HVAC infrastructure by replacing the existing systems with energyefficient heat pumps, eliminating the need for natural gas piping. The scope includes: Demolition and removal of existing gas piping. Installation of new heat pump systems in both office and production areas. Integration of a Dedicated Outdoor Air System (DOAS) in the production area to enhance ventilation Bid Questions Deadline: October 3, 2025 @ 5 pm All questions must be submitted in writing to Nitin Rathod nitin.rathod@p2sinc.com Sealed bids, clearly marked Accor Technology Building HVAC System Improvements, Chelan Douglas Regional Port Authority. Bid Bond Each bid must be accompanied by a bid security in the form of a certified check, cashier's check, or bid bond in an amount equal to not less than five percent (5%) of the total bid. The bid amount shall be submitted with the understanding that if bid is accepted, Bidder will enter into a formal contract with CDRPA in accordance with the form of agreement and that the required Performance Bond and Payment Bond will be provided. The CDRPA reserves the right to reject any or all bids, to waive any formalities in the bidding, and to make the award in the best interest of the CDRPA. The Chelan Douglas Regional Port Authority (CDRPA) owns the industrial building at 3310 5th Street SE in East Wenatchee, Washington. This building is currently leased to Accor Technology, Inc., a manufacturer of plumbing materials. The building's existing heating, ventilation, and air-conditioning (HVAC) system consists of at least five independent systems of varying sizes, ages, and manufacturing brands. Each system includes indoor air handling units (AHUs) with cooling coils and fans, natural gas or electric heaters, and outdoor condensing units. Some systems feature multiple outdoor compressors and fans. The indoor AHUs are ducted to the exterior to provide ventilation air. The office area HVAC system includes six gas-fired furnaces (F-1 to F-6) paired with direct expansion (DX) condensing units. The production area is served by four gas-fired AHUs (AHU-1 to AHU-4) with DX condensing units. Scope of Work: This project will upgrade the building s HVAC infrastructure by replacing the existing systems with energyefficient heat pumps, eliminating the need for natural gas piping. The scope includes: Demolition and removal of existing gas piping. Installation of new heat pump systems in both office and production areas. Integration of a Dedicated Outdoor Air System (DOAS) in the production area to enhance ventilation Bid Documents: The Chelan Douglas Regional Port Authority (CDRPA) owns the industrial building at 3310 5th Street SE in East Wenatchee, Washington. This building is currently leased to Accor Technology, Inc., a manufacturer of plumbing materials. The building's existing heating, ventilation, and air-conditioning (HVAC) system consists of at least five independent systems of varying sizes, ages, and manufacturing brands. Each system includes indoor air handling units (AHUs) with cooling coils and fans, natural gas or electric heaters, and outdoor condensing units. Some systems feature multiple outdoor compressors and fans. The indoor AHUs are ducted to the exterior to provide ventilation air. The office area HVAC system includes six gas-fired furnaces (F-1 to F-6) paired with direct expansion (DX) condensing units. The production area is served by four gas-fired AHUs (AHU-1 to AHU-4) with DX condensing units.

Post-Bid

Industrial

$500,000.00

Public - County

Renovation

25

13

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
7
Bidding Soon
294
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2025

November 3, 2025

Project location map

3310 5th St SE, East Wenatchee, WA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.