Demolition, site work and asbestos abatement for a residential development in Reed City, Michigan. Completed plans call for the demolition of a residential development; for site work for a residential development; and for asbestos abatement for a residential development.
**As of October 23rd, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The Osceola County Land Bank Authority (Land Bank) is requesting proposals for Demolition & Debris Removal and Asbestos Containing Material & Hazardous Materials Removal & Disposal for the building. This project is part of the Osceola County Land Bank State Land Bank Blight Elimination Grants. Vendor selection will be based upon proposals submitted to the Land Bank. The Land Bank intends to award a contract to the lowest, most qualified, and responsible bidder(s). No award will be made until the bids have been evaluated for completeness and award ability under the Federal Contracting requirements. Question Deadline 10/02/2025 at 4:00 PM ET - If you have any questions about this Request for Proposal, please feel free to contact: Tonia Hartline, Osceola County Land Bank Chair: treasurer@osceolacountymi.gov. This project consists of building and site demolition of buildings and basement/foundation including backfill of the excavation, securing all necessary permits (demolition, water/sewer cuts, soil erosion, Right-of-Way, and any other required permits by Local, State or Federal government) and disconnect gas, water (if not already completed) and sewer utilities or cap wells and abandonment of septic (if any). Contractor must comply with all federal and administrative requirements which will ensure that all work is performed and carried out in a safe and timely manner. It is the responsibility of the Contractor to provide and maintain all qualified personnel, equipment, materials and other resources necessary to perform activities identified in this Scope of Service. A description of the work of the contract can be summarized as follows: 1. File 10 day demolition notification. 2. Right of Way Permits must be pulled for the property at the City of City Public Service Department if needed. 3. Confirm Gas lines per Consumers Energy have already been shut off at main, retired, and/or capped. Provide confirmation from utility. 4. Electric and Water service disconnect, provide confirmation from utility. 5. Contractor will work with City of City officials to ensure that all sewer lines connected to demolished and removed structures are appropriately and securely capped and inspected. If a septic tank is located, the contents needs to be pumped, inspected, and then removed. 6. Soil Erosion control - if a property is within 500 feet of a lake, body of water, stream or county drain, a permit and application must be filed with the City of City. Controls must be implemented, and procedures must follow the City of City Ordinances. 7. Open Hole Inspection is required and shall be approved prior to any backfilling operations. Contact the OCLBA for inspection. 8. Protection of trees - It shall be the responsibility of the Contractor to protect all trees of a diameter of 4" or greater that are located outside of five (5) feet from the structure being demolished. 9. Site and Building demolition a. Be aware of property corners and lot lines accurately to set limit of demolition/deconstruction. While some properties may receive stake surveys prior to demolition, contractor is responsible to verify property location. Any properties with completed surveys will have copies of those surveys available in the Osceola County Land Bank Authority office. b. Create 2-4 holes in attic (if applicable) and pre-soak with water for at least 5 minutes before demolition. Remove surplus satisfactory soils and waste material, including unsatisfactory soil, trash, and debris. Dispose of it off of Land Bank Property, in a legal facility. The work of excavating, filling, and grading shall be included in the lump sum project cost. The work of grading shall include all labor, materials, and equipment necessary for filling and compacting the sub-grade prior to placing any improved surface. Any areas disturbed by construction activities shall be re-graded and reseeded as necessary. A site visit to observe and record the Property use and conditions was conducted by Aaron Paquet of Red Cedar on July 24, 2025
Award
Residential Subdivision
$13,500.00
Public - County
Asbestos Abatement, Demolition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 9, 2025
November 13, 2025
214 N Chestnut St, Reed City, MI
Related To This Project
Reed City, MI
Bid Date: Oct 14 2025
Reed City, MI
Bid Date: Nov 19 2025
Reed City, MI
Bid Date: Nov 07 2025
Reed City, MI
Bid Date: Sep 03 2025
Reed City, MI
Bid Date: Aug 08 2025
Reed City, MI
Bid Date: Jul 23 2025
Reed City, MI
Bid Date: Apr 30 2025
Reed City, MI
Bid Date: Mar 04 2025
Reed City, MI
--
Reed City, MI
Bid Date: Mar 04 2025
Reed City, MI
Bid Date: Mar 10 2025
Reed City, MI
Bid Date: Apr 04 2025
Reed City, MI
Bid Date: Jan 14 2025
Reed City, MI
Bid Date: Dec 05 2024
Reed City, MI
Bid Date: Jul 30 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.