BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 30, 2026 at 7:00 PM

Updated January 31, 2026

Demolition, site work, paving and new construction of a mixed-use development in Olyphant, Pennsylvania. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This Project is for the Rehabilitation of an Existing Structure on State Route 347, Section Prs, in Olyphant Borough, Lackawanna County, in the Commonwealth of Pennsylvania. The Project is Located Along Sr 347 at the Structure Over Lackawanna River, From Segment 0100 Offset 0857 (North of N. River Street) and Continues to at Segment 0100 Offset 1286 , (South of Main Street) Overall Length 429lf. The Proposed Work Involves Rehabilitation of the Existing Two-span, Adjacent Box Beam Bridge Which Will Be Milled and Paved, the Existing Sand Bar Will Be Removed, Ada Improvements Will Be Installed in the Area and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package. Maintenance and Protection Will Require a Detour for the Lackawanna Heritage Trail During Construction as Well as a Commercial Driveway; However, Sr 347 Will Remain Open. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 20.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Reconstruction Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PADOT - SR 347 Over Lackawanna River *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Bridges / Tunnels

$1,639,276.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

71

10

9

6

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
427
Active Projects
228
Bidding Soon
2,104
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2026

March 16, 2026

Project location map

PA-347, Olyphant, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.