Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 8, 2026 at 8:00 PM
Updated July 14, 2026
Demolition, site work, paving and new construction of a civil project in Scranton, Pennsylvania. Completed plans call for site work for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.
The Project Involves the Superstructure Replacement for Two (2) Structures Carrying Sr 3023 and Sr 8025 Traffic Over Roaring Brook and Bridge Preservation Work on the Sr 8025 Structure Over President Biden Expressway Ramp D Along With Approach Roadway Improvements. Replacement Superstructures Include a Single Span Composite P/S Concrete Spread Box Beam and a Four (4) Span P/S Concrete Spread Pa Bulb-tee Beam Superstructure. Other Work Includes Roadway Approach Pavement Reconstruction and Shoulder Widening, Guide Rail Replacement, E&s Control Measures, Temporary Traffic Control, Signing and Pavement Marking, Partial Structure Removal, and Other Miscellaneous Construction Work. Construction of the Bridges Will Be Completed Using Staged Construction as Well as While Traffic is Detoured as Indicated on the Approved Drawings Included in the Bid Package for State Route 3023, Section D50 in Lackawanna County, City of Scranton From a Point Approximately 0.4 Mile North of Birch St at Segment 0060 Offset 0298 to a Point 0.2 Miles South of President Biden Expressway at Segment 0060 Offset 1088 and State Route 8025, Section 250 in Lackawanna County, City of Scranton From a Point Approximately 0.2 Miles South of Mulberry St at Segment 0500 Offset 0000 to a Point Approximately 0.5 Miles North of Birch St at Segment 0500 Offset 0688 and State Route 8025, Section Prs in Lackawanna County, City of Scranton From a Point Approximately 0.2 Miles South of Jefferson Ave. At Segment 0500 Offset 0494 to a Point Approximately 0.5 Miles North of Birch St at Segment 0500 Offset 0688 With a Total Work Area Length of 1572.12 Feet (0.298 Miles). Project Cost Range: $15,000,000.00 - $19,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 63.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Reconstruction Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PADOT - SR 3023 Over Roaring Brook *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
GC Bidding
Bridges / Tunnels
$20,000,000.00
Public - State/Provincial
Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 2, 2026
SR-3023, Scranton, PA
Related To This Project
Scranton, PA
--
Scranton, PA
Bid Date: Oct 23 2025
Scranton, PA
Bid Date: Nov 05 2025
Scranton, PA
Bid Date: Oct 20 2025
Scranton, PA
Bid Date: Nov 14 2025
Scranton, PA
Bid Date: Nov 26 2025
Scranton, PA
Bid Date: Nov 17 2025
Scranton, PA
Bid Date: Nov 18 2025
Scranton, PA
Bid Date: Sep 25 2025
Scranton, PA
Bid Date: Sep 25 2025
Scranton, PA
Bid Date: Sep 25 2025
Scranton, PA
Bid Date: Sep 25 2025
Scranton, PA
Bid Date: Sep 10 2025
Scranton, PA
Bid Date: Aug 21 2025
Scranton, PA
Bid Date: Aug 12 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
