Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 29, 2025 at 8:00 PM
Updated September 30, 2025
Renovation of a playground / park / athletic field in Thomson, Georgia. Completed plans call for the renovation of a playground / park / athletic field.
Generator Installed at Sweetwater Park PROJECT DESCRIPTION: The work described below will be for the purchase of and installation of a 300 kW Blue Star Generator, 277/480 volt, three phase, PMG, 60 Hz as well as automatic transfer switch and accessories, to be installed at Sweetwater Park. Scope of Work This scope of work shall include the delivery of all equipment, the offloading of equipment, installation of exhaust system, using a test system after installation by others, onsite training, NFPA 110 start up. Four-hour load bank test, one hundred gallon test fuel, concrete pad, conduit, wiring, and a crane. The scope of work that isn't included in this could be a tank full of diesel fuel and a type of fence for the equipment. Generator and accessories General Information 1. Include an itemized price for all equipment, supplies, and installation. 2. Vendor must be able to provide all equipment to submit a bid. 3. Vendor must provide an available delivery and installation date. Specifications Quantity Description 300 kW Blue Star Generator, 277/480 volt, three phase, PMG, 60 Hz with the following features and accessories and one automatic transfer switch and accessories. Generator Perkins Diesel engine w/ isochronous governor Sound attenuated weather protective housing Block heater Digital Control Panel 600 amp main line breaker Full safety shutdowns Critical exhaust system- mounted Battery, rack and cables Battery charger w/ alarms Initial fill of antifreeze and oil Forty-eight hour dual well base fuel tank- UL approved with low fuel and leak alarms One year warranty Automatic Transfer Switch 600 amp automatic transfer switch, 277/480 volt, three phase, three pole, with the following features and accessories: Service entrance rated Plant exerciser Time delay engine start Time delay transfer to emergency Time delay retransfer to normal Test switch Nema 3R enclosure One year warranty, owner's manual, remote annunciator, and E-stop
Post-Bid
Playgrounds / Parks / Athletic Fields
$300,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 26, 2025
October 27, 2025
180 Sweetwater Rd, Thomson, GA
Related To This Project
Thomson, GA
Bid Date: Jan 15 2026
Thomson, GA
--
Thomson, GA
Bid Date: Oct 31 2025
Thomson, GA
Bid Date: Oct 16 2025
Thomson, GA
Bid Date: Nov 20 2025
Thomson, GA
Bid Date: Nov 26 2025
Thomson, GA
Bid Date: Sep 24 2025
Thomson, GA
Bid Date: Sep 17 2025
Thomson, GA
Bid Date: Sep 17 2025
Thomson, GA
Bid Date: Sep 17 2025
Thomson, GA
Bid Date: Sep 17 2025
Thomson, GA
--
Thomson, GA
Bid Date: Aug 01 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed