BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 28, 2025 at 8:00 PM

Updated October 29, 2025

Site work and new construction of a pre-engineered storage facility in Lincoln, Nebraska. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Question Deadline 10/09/2025 Bidders and Sub-bidders requiring clarification or interpretation of the Bidding Documents shall request such clarification from NDOT at least seven (7) calendar days prior to the bid opening date. Direct inquires to Capital Facilities, Joshua Cowan by telephone at 402.479.3746 or by emailing joshua.cowan@nebraska.gov Project includes supply and installation of fabric structures on 4-foot minimum precast L- panels at various locations throughout Nebraska on existing concrete footings. Fabric structures will beinstalled at the following locations: Albion (30x50) Columbus (30x50) O'Neill (40x50) All bids shall be made on the printed proposal forms attached to and made a part of the Proposed Contract Documents and submitted in a sealed envelope marked "NDOT Statewide Fabric Structures". NDOT Statewide Fabric Structures Project includes supply and installation of fabric structures on 4-foot minimum precast L- panels at various locations throughout Nebraska on existing concrete footings. bid Note: Bids delivered in person shall be delivered to: Nebraska Dept, of Transportation Operations Division-Attn: Mallory Malone 5001 South 14th Street Lincoln, NE Please note: This location is the Operations Building located south of the State Penitentiary. NOTICE: Bids submitted by facsimile or electronic transmission are NOT ACCEPTABLE. Each Bidder must submit with the bid a certified or cashiers' check or a bid bond on AIA form A310 in an amount equal to five (5%) of the bid. The character and amount of security must be submitted by the Contractor for the performance of the Contract is stated in the proposed contract documents. Bidders may not withdraw their bids for a period of at least sixty (60) days after the scheduled closing time for the receipt of the bids. The State of Nebraska, Department of Transportation reserves the right to reject any or all bids and re- advertise for Bids; reserves the right to waive informalities and irregularities and to make awards on bids which furnish the materials and construction that will in their opinion serve the best interests of the State.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$200,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
26
Bidding Soon
830
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2025

November 17, 2025

Project location map

Multiple Locations, Lincoln, NE


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.