BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 14, 2025 at 7:00 PM

Updated November 20, 2025

Site work for a water / sewer project in Whittier, California. Completed plans call for site work for a one-story above grade water / sewer project.

Question Deadline 10/07/2025 at 5:00 PM PT All Questions or Requested Clarifications Shall Be Made in Writing via Email at Pubwks@cityqfwhittier.org The Bailey Street Sewer Replacement Project consists of the replacement of approximately 1,275 LF (Attachment A) of existing 6-inch vitrified clay sewer main with new 8-inch diameter polyvinyl chloride (PVC) sewer pipeline at various locations. The scope of work also includes removing existing manholes and replacing them with new concrete manholes at multiple locations, removing an existing 8-inch sewer bypass, connecting the existing sewer main on Hill Avenue to the new manhole on Bailey Street, and connecting the new sewer main to the existing manhole on Painter Avenue, in accordance with the project plans as specified hereinafter, project specifications as specified hereinafter for the Whittier Utility Authority, Los Angeles County, State of California, and in accordance with the Standard Specifications for Public Works Construction (The Greenbook), 2021 Edition. Contractor shall furnish all necessary labor, tools, materials, appliances, and equipment to complete the project and be responsible for obtaining a no fee excavation permit(s) for the project from the City of Whittier, Public Works Department.

Award

Water / Sewer

$674,750.00

Public - City

Site Work

7

5

4

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
637
Active Projects
273
Bidding Soon
3,310
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2025

December 22, 2025

Project location map

13408 Bailey St, Whittier, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.