BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 20, 2025 at 7:00 PM

Updated November 21, 2025

Site work and paving for a mixed-use development in San Diego, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Reference Number 0000400139 Deadline for Jobs Coordinator Pre-Qualification Request and Application: Date: 10 calendar days prior to the Deadline for Bid Submittal Email: SANDAGCBA@sandag.org Question Deadline 11/12/2025 at 5:00 PM PT. Questions are submitted online Yes, All questions relating to the IFB must be received in writing via online Direct, no later than the Deadline for Questions listed on the cover page. Project Duration: Base Bid: 260 working days Liquidated Damages: $6,000.00 per day Participation Requirements - Disadvantaged Business Enterprise (DBE) General Requirements - Contractors License Required - Federally Funded - Insurance Required - Prevailing Wage Required Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Payment Bond 100 % San Diego Association of Governments (SANDAG) is seeking to deliver the North Park/Mid-City Bikeways: Orange Bikeway project. This work consists, in general, of constructing approximately 2.1 miles of on-street bikeway on Orange Avenue between 32nd Street and Estrella Avenue. This corridor is a portion of the Phase 2 North Park/Mid-City Bikeways. This street section is listed as a Bicycle Boulevard in the City of San Diego's Regional Bicycle Master Plan. The Orange Bikeway is a proposed bicycle boulevard including buffered bike lanes with traffic calming features such as traffic diverters, neighborhood traffic circles, curb extensions, speec cushions, enhanced pedestrian crossings, raised crosswalks, accessibility enhancements, and traffic signal modifications. Work includes, but is not limited to, traffic control; erosion control; clearing and grubbing; curb ramps, curb and gutter, cross gutter improvements, colored concrete diverters, and sidewalk improvements; roadway excavation earthwork/grading; asphalt concrete pavement rehabilitation; PCC pavement; landscaping; flow through BMPs; wayfinding signage; pavement markings and signage; street lighting; RRFB's; trenching and backfill for underground electric conduits; traffic signal modification. The Additive Alternate consists of additional pavement rehabilitation along Orange Avenue. The work will also include procurement of all materials and performing all other work necessary to complete the work in accordance with the project plans and specifications This project is federally funded and has a DBE goal of 22%. The Engineer's Estimate is $6,653,890.00. This project is subject to the Community Benefits Agreement (CBA).

Bid Results

Roads / Highways

$5,932,313.00

Public - City

Paving, Site Work

176

20

20

8

Subscribe For Documents

111 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
254
Active Projects
94
Bidding Soon
1,345
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2025

January 15, 2026

Project location map

Multiple Locations, San Diego, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.