BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 4, 2025 at 7:00 PM

Updated November 5, 2025

Site work, paving and addition to a mixed-use development in San Diego, California. Completed plans call for site work for a fitness / recreation center; sidewalk / parking lot; for paving for a sidewalk / parking lot; and for the addition of a 16,000-square-foot fitness / recreation center.

Scope of Services The Trustees of The California State University are requesting Statements of Qualifications (SOQ) from interested and qualified design-builders (Respondents) to design and build the above-named Project. The Trustees will select a design-build team consisting of a general contractor and architect (Design-Builder) using a two-step process: (1) this Request for Qualifications (RFQ) from which Respondents may submit SOQ to the Trustees, and (2) the Request for Proposals (RFP) which the Trustees will issue to the shortlisted firms. Other Details In general, the scope of work consists of the design and construction, under a procedure more commonly referred to as "turnkey construction", of a Fixed Price Design-Build Project, for the ARC Expansion II Project. The Project includes: We are seeking a Design-Build team to expand the Aztec Recreation Center (ARC) by approximately 16,000 GSF into the adjacent P8 parking lot. This project aims to meet the growing recreation, fitness, and wellness needs of SDSU students, particularly as the University's enrollment--and specifically its on-campus residential population--continues to rise. The current 134,000-square-foot ARC serves a student body of roughly 38,500 and is increasingly challenged by overcrowding and long wait times for equipment and group fitness classes. The expansion will allow for new and enhanced programming, benefiting both SDSU students and the broader campus community. Beyond meeting physical wellness needs, the enhanced facility will support student engagement, retention, and success; contribute to the overall residential experience; and align with the University's mission and values. To accommodate the loss of parking, a new lot with 22 ADA-compliant spaces and 6 standard stalls will be constructed across the street on 55th located outside the University Police Department. The cost of this new parking lot will need to be incorporated into the overall project budget. Question Deadline 10/22/2025 at 2:00 PM PT Respondents must submit all questions regarding this RFQ in writing at the website. Start/Delivery Date Estimated February 2026 Project Duration Approximately 912 days for project completion.

Post-Bid

Fitness / Rec Centers

$23,000,000.00

Public - State/Provincial

Addition, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

67 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
270
Active Projects
110
Bidding Soon
1,446
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2025

February 2, 2026

Project location map

5301 55th St, San Diego, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.