BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 14, 2025 at 7:00 PM

Updated November 15, 2025

Site work and paving for a civil project in Los Angeles, California. Completed plans call for site work for a pipeline; road / highway; and for paving for a road / highway.

Scope of Services Project consists of nonexclusive on-call general maintenance and site improvements throughout the San Pedro, Wilmington, and Terminal Island districts, as directed by Engineer. Work includes, but is not limited to, removal of pavement and other improvements, pipelines, and substructures; earthwork; construction of fencing, parking barriers, and traffic controls; construction of pavements, pavement markings, and other improvements; relocation of substructures and utilities; and site clearing. Work also includes trenching and backfilling, preparing soil, landscaping, planting, hardscaping, irrigation systems, site furnishings, and plant establishment and maintenance. For further information, please email Willie Alvarez, Construction Manager, at WAlvarez@portla.org Online Q&A Yes Q&A Deadline 11/10/2025 11:59 PM (PDT) Bid Bond 10.00% Payment Bond 0.00% Performance Bond 0.00% Scope of Work: Contractor shall perform Work necessary to complete Contract in satisfactory manner. Furnish transportation, labor, materials, equipment, mobilization, demobilization, and incidentals necessary to perform Work which may or may not include but is not limited to the following: 1. Secure necessary and permits, perform coordination Work, regulatory requirements, and site environmental requirements for Project. 2. Demolition and removal Work not limited to demolition of oil pipelines, concrete and asphalt concrete pavements, curbs, gutters, sidewalks, chain link fences, railroad tracks, and other improvements. 3. Cut and cap/plug existing utilities, sewer, electrical, water, and other utility lines. 4. Fill, compact, and grade voids and excavations caused by the demolition and removal Work. 5. Grading of Project Site(s). 6. Furnish and place asphalt concrete. 7. Renovate existing pavement by cold milling, saw cutting, crack filling, crack sealing, seal coating, and slurry sealing. 8. Construct concrete and asphalt concrete pavements, sidewalks, and concrete curbs and gutters. 9. Place, grade, and compact earth fill and crushed miscellaneous base provided by the Department, by Contractor, and from on-site sources. 10. Earthwork including clearing and grubbing, rough grading, and compacting of subgrade. 11. Place, grade, and compact earth fill and crushed miscellaneous base. 12. Pavement markings and striping. 13. Construct chain link and decorative metal fences and gates associated foundations.Provide water trucks to distribute dust control agent and to achieve compaction of earth materials. 15. Apply dust and erosion control agent over graded area. 16. Furnish and install Temporary Railing (Type K) K-Rail (in accordance with Caltrans Standard Drawings T3A), plastic water filled barrier, and wheel stops. 17. Construct concrete dolly strips and transtainer runways. 18. Stabilize soil using geogrid and concrete slurry. 19. Erosion barriers including silt fence and sand bags. 20. Construct miscellaneous electrical PVC conduit utility system. 21. Construct fiber optic system. 22. Excavate, stockpile, and remove soil material. 23. Excavate, characterize, stockpile, haul away, dispose, or recycle contaminated/ non-hazardous waste (including hydrocarbon impacted) soil. 24. Stockpile potential chemically impacted soil approved for use on Project. 25. Hardscaping, including installation of concrete pavers, patterned coloredconcrete, river run cobblestone, decomposed granite, and used brick. 26. Install topsoil, fertilizer, headers, and miscellaneous items, lawns, plants, shrubs, trees, and vines.27. Install irrigation systems. 28. Construct sanitary sewerage and storm drainage systems. 29. Construct concrete flatwork. 30. Site cleaning and removal of debris, equipment, and excess material from Project Site(s) and any Laydown Area(s) upon completion of Work. 31. Other Work necessary to complete Project.

Bid Results

Roads / Highways

$23,602,280.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

29

Subscribe For Documents

94 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
585
Active Projects
291
Bidding Soon
3,964
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2025

January 12, 2026

Project location map

Multiple Locations, Los Angeles, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.