Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 7, 2025 at 7:00 PM
Updated November 8, 2025
Site work and paving for a sidewalk / parking lot in Redwood City, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Ohlone-portolá Heritage Trail Historic Monument Project The work to be done consists, in general, of the installation of monuments andinterpretive signage posts at four (4) locations along the Ohlone-Portola Heritage Trail. One (1) State Memorial are each to be installed at the Cowell-Purisima Coastal Trail Overlook, Crystal Springs Overlook at the Crystal Springs Dam, Tunitas Creek Overlook at Don Horsley County Park at Tunitas Creek Beach, and at the Hillcrest location at Crystal Springs Trail in Millbrae, as well as any other items and details not mentioned above, but required by the Project Plans, Standard Specifications and these Special Provisions, and the directions of the Engineer. Construction Sign Construction Waste Management Sapling Planting Decomposed Granite Paving Granitecrete Paving Erosion and Sediment Control Concrete Paving Boulder Split Rail Wood Fence Steel Edging Bike Rack and Tool Station (Relocation) Interpretive Signage Posts Bronze Plaque Engineer's Estimate of Costs: $ 170,000 Question Deadline 10/09/2025 at 5:00 PM PT Questions regarding the Contract Documents concerning items such as discrepancies, conflicts, omissions, doubts as to meanings, or regarding scope of bid items shall be referred to the Engineer. Inquiries must be received in writing via email, to enacpil@smcgov.org and azhang@smcgov.org, not less than five (5) working days prior to bid opening. The Contractor shall possess either a Class A License or a combination of Class C licenses that are applicable for the majority of the work at the time this contract is awarded. No Contract will be awarded to a Bidder who is not licensed as required by laws of the State of California. The County of San Mateo reserves the right to reject any or all bids and/or waive any informalities or irregularities in any bid received. Diversion Goals Completion - (30) WORKING DAYS 1/5108
Award
Sidewalks / Parking Lot
$144,935.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 16, 2025
November 17, 2025
Multiple Locations, Redwood City, CA
Related To This Project
Redwood City, CA
Bid Date: Nov 05 2025
Redwood City, CA
Bid Date: Oct 29 2025
Redwood City, CA
Bid Date: Nov 04 2025
Redwood City, CA
Bid Date: Oct 22 2025
Redwood City, CA
--
Redwood City, CA
Bid Date: Dec 10 2025
Redwood City, CA
Bid Date: Nov 18 2025
Redwood City, CA
Bid Date: Nov 13 2025
Redwood City, CA
Bid Date: Nov 18 2025
Redwood City, CA
Bid Date: Oct 08 2025
Redwood City, CA
Bid Date: Nov 03 2025
Redwood City, CA
--
Redwood City, CA
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
