BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 25, 2025 at 7:00 PM

Updated November 26, 2025

Site work and paving for a sidewalk / parking lot in Plainfield charter Township, Michigan. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Kent County Purchasing Division is soliciting bids for the Kent County Parks Department to construct a Shared Use Pathway and Pedestrian Tunnel at Rogue River Road and Northland Drive. Work is to be completed in three (3) phases and may begin as soon as April 1, 2026, with final completion by November 14, 2026. Compliance with the Davis-Bacon Act is required of the contractor and all subcontractors for this project. SCOPE The Shared Use Pathway and Pedestrian Tunnel Project includes three (3) phases: 1. Phase 1A/B - East Approach Clearing, Storm Outlet, Removals, & Earth Excavation Phase 1C - West Approach Clearing, Removals, & Earth Excavation 2. Phase 2 - Closure of Northland Drive/M-44 3. Phase 3 - East and West Approaches, Path, & Landscaping Inquiries Deadline Date & Time (local) 10/20/2025, 2 PM - Any and all communication regarding this Solicitation shall be on the Kent County Purchasing Division Inquiry Blog via the Bid Opportunities page or during pre-proposal meetings. Phase 1A/B - East Approach Clearing, Storm Outlet, Removals, Earth Excavation Schedule: Work may begin as soon as April 1, 2026. Scope Summary: Construct 30-inch storm sewer outlet and pipe across loop ramp, in infield area, and along NB M-44. Excavation and grading for east approach walls, path, and east pedestrian culvert sections. Phase 1C - West Approach Clearing, Removals, Earth Excavation Schedule: Work may not begin for the west approach until after Meijer LPGA Classic. Scope Summary: Excavation and grading for west approach in preparation for Phase 2. Phase 2 - Closure of Northland Drive/M-44 Schedule: Work may not begin on Phase 2 until the Contractor has all private utility relocations coordinated and has all necessary materials on site needed to install the pedestrian tunnel/culvert across the road as well as coordination for repaving of the road once tunnel/culvert sections are set. Other restrictions: Limit of full closure shall be no more than 3 full calendar days, must span a single weekend, and may not be during any Holiday periods, local festivals or during any major events. Damages: See Special Provision for Liquidated Damages for Other Department Costs for Contract Identification 2240428. $10,000 per hour longer than traffic restrictions detailed in Special Provision for Maintaining Traffic to re-establish traffic in each direction continuously for the remainder of the project. Scope Summary: Close Northland Drive/M-44 to all traffic between West River Drive/Cannonsburg Road and Rogue River Road/& Seven Mile Road. Access shall be maintained to Blythefield County Club, but not THRU Northland Drive/M-44. Remove road surface, relocate any utilities necessary, construct Pedestrian Tunnel and associated bedding and drainage system, backfill, rebuild lanes of Northland Drive/M-44 to receive traffic. Phase 3: East and West Approaches, Path, and Landscaping Schedule: Once traffic is re-opened, Lanes and shoulder closures may occur under daily traffic restrictions. Scope Summary: Construction of east and west approach walls, path, storm sewer, grading, guardrail, landscaping, and restoration. Final Completion: The project shall be completed and ready for final payment with the exception of watering and cultivating, by November 14, 2026. Damages: $1,500 per calendar day if work is not completed by November 14, 2026.

Award

Sidewalks / Parking Lot

$7,471,804.00

Public - County

Paving, Site Work

42

9

19

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
150
Active Projects
84
Bidding Soon
1,380
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2025

April 1, 2026

Project location map

Rogue River Rd NE & Northland Dr NE, Plainfield charter Township, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.