BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 1, 2025 at 7:00 PM

Updated December 20, 2025

Renovation of a mixed-use development in Sheridan, Wyoming. Completed plans call for the renovation of a educational facility; and educational facility.

**As of December 01, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following 1. The project consists of the following a. Sheridan Junior High School - Sanding and resurfacing of two (2) existing wood athletic floors. b. Sheridan High School - Screen and recoat two (2) existing wood athletic floors. 2. The scope of work for the four (4) wood gymnasium floors breaks down as follows; a. Sheridan Junior High School, 1) Main Gymnasium - (Dimensions - 105'-0" x 91'-4" - Field Verify) a) Sand and resurface b) Replace vented base c) Replace the floor plates at the floor sleeves - 18 Total d) Provide 2 sideline logos - facing opposite directions. e) New game-line striping. 1 Main basketball court - with 8"-10" painted border, painted keys, stained 3 point arc. Painted sideline logos, 1 Main volleyball court 2 Cross court basketball courts 2 Cross court volleyball courts 6 Pickleball/badminton courts 2 Plyometric ladders (10 squares per ladder) 10 sets Plyometric dots (5 dot pattern) Project Identification: Sheridan County School District No. 2 - Gym Floor Renovations 2026. 1. Location 1: Sheridan Junior High School, 500 Lewis Street, Sheridan, WY 82801. 2. Location 2: Sheridan High School, 1056 Long Drive, Sheridan, WY 82801 Question Deadline 10/22/2025 The work includes, The screening and recoating of two existing wood athletic floors at Sheridan High School. The sanding and resurfacing of the main gymnasium and the multipurpose gymnasium at the Sheridan Junior High School. Refer to Specification Section 01 1000 Summary for a detailed description of the work in each of the four (4) gymnasiums. Gym floor renovations include sanding and resurfacing two gym floors at Sheridan Junior High School and screen and recoat (yearly maintenance) at two gym floors at Sheridan High School. Bids will be received in paper format in a sealed envelope at the designated location. A non-mandatory but encouraged pre-bid conference will be held, starting at Sheridan Junior High School and then moving to Sheridan High School.

Bid Results

Educational

$160,959.00

Public - County

Renovation

4

8

2

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
0
Bidding Soon
64
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2025

November 28, 2025

Project location map

Multiple Locations, Sheridan, WY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.