Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 6, 2026 at 7:00 PM
Updated January 7, 2026
Site work, new construction and renovation of a mixed-use development in Webster City, Iowa. Working plans call for the renovation of a laboratory facility; office development; for the construction of a water / sewer project; and for site work for a water / sewer project.
The Webster City Wastewater Treatment Plant Improvements project generally includes the construction of a new SBR wastewater treatment facility adjacent to the existing wastewater treatment plant including improvements at the headworks, digesters, the electrical and control systems; renovation or construction of office and laboratory; and miscellaneous building repairs and improvements. The Owner anticipates the total project Contract Price will be approximately $28.5M. The owner has determined a prequalified list of construction managers. The owner has determined a prequalified list of construction managers. The owner has determined a prequalified list of construction managers. The CMAR Contract has an expected start date of September 2026 and duration for construction of approximately 500 calendar days. Question Deadline 11/05/2025 at 12:00 PM CT HER INSTRUCTIONS Candidate firms are not to rely on any oral instructions or answers. Questions shall be submitted prior to the Questions Deadline outlined above. Questions may be submitted by email in writing to Darin Jacobs at the following email address: djacobs@snyder-assciates.com. Include the following subject line with all questions/communications: Webster City CMAR RFQ Questions The Webster City Wastewater Treatment Plant Improvements project generally includes the construction of a new SBR wastewater treatment facility adjacent to the existing wastewater treatment plant including improvements at the headworks, digesters, the electrical and controlsystems; renovation or construction of office and laboratory; and miscellaneous building repairs and improvements. SCOPE OF SERVICES The CMAR along with the Owner, Architect and Engineer (A/E) Teams will be a critical member of the project team, providing services prior to the start of construction through final acceptance and project closeout. The CMAR services are briefly outlined below for pre-construction, construction, and post construction.: 1. Pricing, phasing, and constructability reviews for construction. 2. Pre-construction services, including cost estimating and bidding services. 3. Construction Manager at Risk of approved scope of work. 4. Solicitation of subcontractors pursuant to Iowa Code 26A. 5. Other pertinent information and required services to complete work. See Exhibit A for more information on the above listed services. Candidate firms are not to rely on any oral instructions or answers. Questions shall be submitted prior to the Questions Deadline outlined above. Questions may be submitted by email in writing to Darin Jacobs at the following email address: djacobs@snyder-assciates.com. Include the following subject line with all questions/communications: Webster City CMAR RFQ Questions.
Final Planning
Water / Sewer
$28,500,000.00
Public - City
New Construction, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 9, 2025
August 10, 2026
Multiple Locations, Webster City, IA
Related To This Project
Webster City, IA
Bid Date: Dec 09 2025
Webster City, IA
Bid Date: Dec 09 2025
Webster City, IA
Bid Date: Dec 09 2025
Webster City, IA
Bid Date: Jul 15 2025
Webster City, IA
Bid Date: Apr 29 2019
Webster City, IA
Bid Date: May 06 2025
Webster City, IA
Bid Date: Apr 29 2025
Webster City, IA
Bid Date: Apr 10 2025
Webster City, IA
Bid Date: Mar 19 2025
Webster City, IA
--
Webster City, IA
Bid Date: Mar 18 2025
Webster City, IA
Bid Date: Dec 05 2024
Webster City, IA
Bid Date: Dec 10 2024
Webster City, IA
Bid Date: Oct 29 2024
Webster City, IA
Bid Date: Oct 08 2024
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
