BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 11, 2025 at 7:00 PM

Updated November 13, 2025

Site work for a water / sewer project in Waynesboro, Georgia. Completed plans call for site work for a one-story above grade water / sewer project.

The work consists of furnishing all products and equipment and performing all labor necessary to complete drainage improvements. This includes, but is not limited to, installation of 860 linear feet of 30-inch ADS-HP storm pipe, 1475 linear feet of 24-inch ADS-HP storm pipe, and 355 linear feet of 18-inch ADS-HP storm pipe. The project also includes construction of 9 curb inlets, a storm manhole, 23 grate inlets, pavement replacement, 850 linear feet of curb and gutter replacement, sediment control, and grassing. All work must be completed within 120 calendar days in accordance with the plans and specifications. Bidders must provide proof of a valid "Utility Contractor" license issued by the State of Georgia, and must employ a "Utility Manager" certification holder to oversee the work. A bid bond or certified cashier's check not less than 10% of the base bid is required. Performance and Payment Bonds, each equal to 100% of the contract price, will be required of the successful bidder. All iron, steel, manufactured products, and construction materials used must be produced in the United States. Compliance with affirmative action provisions and E-Verify regulations is required. The owner reserves the right to reject any or all bids and waive informalities. Plans, Specifications, and Contract Documents are on file at Parker Engineering, LLC. Copies may be obtained from Parker Engineering, LLC., 36 Courtland Street, Suite B, Statesboro, Georgia 30458, Phone: (912) 764-7722, Email: lindsey@parkerengineering. com, upon payment of $150.00 for each full-size set (non-refundable) Time allotted for completion of work is one hundred fifty (150) calendar days. All Work shall be completed in accordance with the plans and specifications. PRE-BID CONFERENCE - N/A

Post-Bid

Water / Sewer

$940,000.00

Public - City

Site Work

16

9

22

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
99
Bidding Soon
1,018
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2025

December 12, 2025

Project location map

615 North Liberty Street Waynesboro GA 30830, Waynesboro, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.