BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 17, 2025 at 7:00 PM

Updated November 21, 2025

Demolition, site work, renovation and addition to a water / sewer project in University Place, Washington. Completed plans call for site work for a one-story above grade water / sewer project; and one-story above grade water / sewer project.

Intent to Bid Due Date: Nov 20th 2025, 1:00 PM PST This project will construct upgrades to the solids handling and solids treatment processes at the existing City of Sumner Wastewater Treatment Plant. These improvements will include construction of an expansion to the existing Solids Handling Building, to include the installation of the new indirect biosolids dryer, thermal fluid heaters, and all associated equipment encompassed in the biosolids dryer scope of supply. The Contractor shall be assigned the portions of the executed Contract titled Biosolids Modernization Project Biosolids Drying Equipment Procurement, for the following items as Specified in the Contract: Equipment Supply, Construction Services, and Post Construction Services. The executed Biosolids Drying Equipment Procurement Contract is attached to the City of Sumner Wastewater Treatment Plant Biosolids Modernization Contract Documents as Part IX. The project will also include construction of a temporary haul truck loading bay to facilitate demolition of existing facilities. Modifications to existing treatment systems, structures and processes will include: replacement of the existing thickened primary sludge pumps in the existing Scum Pump Building, demolition of the existing dissolved air floatation thickener and associated equipment in Equipment Building 2 and the installation of a new rotary drum thickener and associated thickened waste activated sludge pumps, replacement of the existing digested sludge pumps, replacement of the existing thickening and dewatering polymer systems and replacement of the existing air gap system in the existing Solids Handling Building. The existing dewatered sludge conveyance system will also be reconfigured including rehabilitation of the existing dewatered sludge storage hopper, modifications to existing conveyors (both temporary and permanent) and installation of new conveyors. Other project elements include the demolition of the existing waste gas burner and the installation of a new digester gas treatment system to include a hydrogen sulfide and moisture removal and digester gas compression, as well as the installation of a new enclosed waste gas flare. In addition, the existing submersible pumps in Plant Drain Pump Station No. 1 will be replaced and the walls of the existing centrate storage tank will be raised six feet. The internal recycle pumps and anoxic zone mixers in Aeration Basins 1 and 2 and the effluent UV disinfection system will also be replaced. The project will also include installation of new and modifications to existing electrical power distribution and control equipment to support the new improvements, including the installation of a new standby generator with subbase fuel tank in a sound attenuating enclosure. Finally, the project will include construction of a new hammerhead on State Street just outside the entrance to the plant and new security fencing and access gates. The Engineer's estimate range for this project is between $19,000,000 and $20,500,000. For technical questions, please reach out to Courtney Littrell, City of Sumner, at 253-299-5710, bids@sumnerwa.gov. Questions Due Date: Nov 6th 2025, 12:00 PM PST

Post-Bid

Water / Sewer

$20,500,000.00

Public - City

Addition, Demolition, Renovation, Site Work

287

56

737

5

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
166
Active Projects
74
Bidding Soon
1,498
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2025

January 19, 2026

Project location map

10311 Chambers Creek Rd W, University Place, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.