Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 11, 2025 at 7:00 PM
Updated December 12, 2025
Site work and paving for a transportation facility in Spokane, Washington. Completed plans call for site work for a one-story above grade transportation facility.
The work involves rehabilitating the intersection of the primary and secondary runways (RWY 3-21 and RWY 8-26) at Spokane International Airport. This includes removal and replacement of asphalt, pavement grooving, striping, and upgrades to airfield lighting systems. All construction must be performed and completed within a ten-day window, with full-length runway operations resuming immediately after. The estimated maximum allowable construction cost is $7,500,000. Instructions to bidders: Proposals for General Contractor/Construction Manager (GC/CM) Services are requested using the alternative delivery method process permitted under RCW 39.10 for public works contracting. Statements of Qualifications must be submitted to the Spokane Airport Board. A mandatory Pre-Proposal Conference will be held, and participation is required. The project is partially funded by a grant from the Federal Aviation Administration and is subject to federal requirements including Buy America Preference, Foreign Trade Restriction, Davis Bacon Act, Affirmative Action, Debarment and Suspension, Drug Free Workplace Act of 1988, and other federal requirements as identified in the contract documents. Women, Minority, Disadvantaged Business Enterprises, and small businesses are encouraged to participate.
Bid Results
Transportation Terminals
$1,175,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 7, 2025
September 1, 2026
9000 W Airport Dr, Spokane, WA
Related To This Project
Spokane, WA
--
Spokane, WA
--
Spokane, WA
--
Spokane, WA
Bid Date: Nov 06 2025
Spokane, WA
Bid Date: Nov 19 2025
Spokane, WA
Bid Date: Nov 18 2025
Spokane, WA
Bid Date: Nov 26 2025
Spokane, WA
Bid Date: Nov 14 2025
Spokane, WA
Bid Date: Oct 09 2025
Spokane, WA
Bid Date: Oct 09 2025
Spokane, WA
--
Spokane, WA
Bid Date: Oct 24 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
