BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 27, 2025 at 8:00 PM

Updated October 29, 2025

Renovation of a municipal facility in Tacoma, Washington. Completed plans call for the renovation of a municipal facility.

Note: Email may pass through multiple servers before arriving at its destination. Please allow sufficient time for email delivery of submittals. Timely electronic delivery is at the risk of the supplier. In Person: Tacoma Public Utilities Administration Building North, Main Floor, Lobby Security Desk 3628 South 35th Street Tacoma, WA 98409 Monday - Friday 8:00 am to 4:30 pm Project Scope: This project will replace the aging operable acoustic partition which divides the conference room on the 2nd floor of the Solid Waste Management Admin Building with a new partition. The work will require removal of the existing system, preparation of the space, procurement and installation of the new electronic partition, and restoration (e.g. drywall, painting, trim, etc) to bring the final space up to architectural standards. PW10-0170F, 2007-0445 Pre-Proposal Meeting: A pre-proposal meeting will not be held. . Estimate: $140,000 Requests for information regarding the specifications may be obtained by contacting Anela Olson by email to aolson1@tacoma.gov. Questions regarding interpretation of the requirements of the Contract Documents shall be referred to the A/E. Substantial Completion: Achieve within 100 calendar days from NTP. 1. Full use of the conference room shall not be limited for longer than two (2) calendar weeks without approval by the Engineer. Contractor shall coordinate with the Owner to determine schedule of work in conference room. a. The Admin Building where conference room 212 is located is an active office environment with personnel working directly adjacent to the room, the Contractor shall minimize the impacts to the office use as much as is feasible. 2. To minimize disruptions to the office space, Contractor shall coordinate with Owner to provide continued use of the existing partition in the conference room while the new partition is manufactured. B. Achieve Final Completion within seven (7) calendar days after Substantial Completion. Project : 2007-0445

Post-Bid

Municipal

$140,000.00

Public - City

Renovation

19

20

2

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
100
Bidding Soon
1,132
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2025

November 24, 2025

Project location map

3510 S Mullen St, Tacoma, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.