Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 27, 2025 at 8:00 PM
Updated October 29, 2025
Renovation of a municipal facility in Tacoma, Washington. Completed plans call for the renovation of a municipal facility.
Note: Email may pass through multiple servers before arriving at its destination. Please allow sufficient time for email delivery of submittals. Timely electronic delivery is at the risk of the supplier. In Person: Tacoma Public Utilities Administration Building North, Main Floor, Lobby Security Desk 3628 South 35th Street Tacoma, WA 98409 Monday - Friday 8:00 am to 4:30 pm Project Scope: This project will replace the aging operable acoustic partition which divides the conference room on the 2nd floor of the Solid Waste Management Admin Building with a new partition. The work will require removal of the existing system, preparation of the space, procurement and installation of the new electronic partition, and restoration (e.g. drywall, painting, trim, etc) to bring the final space up to architectural standards. PW10-0170F, 2007-0445 Pre-Proposal Meeting: A pre-proposal meeting will not be held. . Estimate: $140,000 Requests for information regarding the specifications may be obtained by contacting Anela Olson by email to aolson1@tacoma.gov. Questions regarding interpretation of the requirements of the Contract Documents shall be referred to the A/E. Substantial Completion: Achieve within 100 calendar days from NTP. 1. Full use of the conference room shall not be limited for longer than two (2) calendar weeks without approval by the Engineer. Contractor shall coordinate with the Owner to determine schedule of work in conference room. a. The Admin Building where conference room 212 is located is an active office environment with personnel working directly adjacent to the room, the Contractor shall minimize the impacts to the office use as much as is feasible. 2. To minimize disruptions to the office space, Contractor shall coordinate with Owner to provide continued use of the existing partition in the conference room while the new partition is manufactured. B. Achieve Final Completion within seven (7) calendar days after Substantial Completion. Project : 2007-0445
Post-Bid
Municipal
$140,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 23, 2025
November 24, 2025
3510 S Mullen St, Tacoma, WA
Related To This Project
Tacoma, WA
Bid Date: Oct 17 2025
Tacoma, WA
Bid Date: Oct 14 2025
Tacoma, WA
Bid Date: Nov 05 2025
Tacoma, WA
Bid Date: Nov 18 2025
Tacoma, WA
Bid Date: Nov 07 2025
Tacoma, WA
Bid Date: Nov 12 2025
Tacoma, WA
Bid Date: Nov 18 2025
Tacoma, WA
Bid Date: Oct 22 2025
Tacoma, WA
Bid Date: Oct 07 2025
Tacoma, WA
Bid Date: Oct 17 2025
Tacoma, WA
Bid Date: Oct 10 2025
Tacoma, WA
--
Tacoma, WA
Bid Date: Nov 25 2025
Tacoma, WA
Bid Date: Oct 28 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
