Site work for a pipeline in Zachary, Louisiana. Completed plans call for site work for a one-story above grade pipeline.
The project involves the replacement of existing PVC natural gas mains with approximately 138,000 linear feet of 4-inch PE coiled pipe and approximately 36,850 linear feet of 2-inch PE coiled pipe in the northwestern and southern portions of the gas system service area. The work also includes the replacement of service pipe totaling approximately 38,500 linear feet of 3/4-inch PE pipe. Additional elements include the installation of 4 and 2 PE ball valves, tracer wire pedestals, necessary road bores, and tie-ins to the existing 4 and 2 inch gas mains, as well as service taps and the transfer of approximately 618 existing customers to the new main. The contractor will also provide miscellaneous fittings, tracer wire, detector tape, and pressure testing at 90 PSI on all new MDPE and 125 PSI on all new HDPE piping or 1.5 MAOP for a turn-key project. All employees must be OQ certified, and the contractor must provide evidence and documentation of Operator Qualification Program compliance for all covered tasks. The project is subject to Build America, Buy America (BABA) requirements and all applicable materials must be produced in the United States. Bidders must provide required documentation for BABA compliance for all materials and components. Pre-qualification requirements: Bidders must be pre-qualified before obtaining bidding documents by submitting a written Operator Qualification and Training Program meeting the certification requirements of the US DOT PHMSA and Louisiana Department of Natural Resources Pipeline Safety Division. Specific scrutiny will be given to workmen's certification to perform covered tasks related to PE gas line installations. At least six workmen, including one supervisor, must be OQ certified for all covered tasks. Bidders must have at least three years of experience constructing Natural Gas Polyethylene Pipeline facilities, an ongoing Drug and Alcohol Mis-use Program, and provide three references from natural gas distribution system operators who have performed work exceeding $250,000 in the past five years. Only contractors and subcontractors who meet these requirements may obtain bidding documents. Additional required documents include attestation forms (criminal convictions), E-Verify affidavit, non-collusion affidavit, and drug testing affidavit, as well as a bid security of five percent of the bid amount. Bidders must be properly licensed under Louisiana law in the appropriate classification. Only responsible bidders will be considered, and lowest three bidders may be required to submit additional documentation within 10 days after bid receipt. All proposals must be submitted on engineer-provided forms and accompanied by required documentation and security. QA date - 10-31-2025 Questions concerning the contract package may be addressed to Brian Suberbielle at SJB Group, L.L.C. at the address and phone numbers above, or he may be contacted by email at brian.suberbielle@sjbgroup.com. All questions about the meaning or intent of the Contract Documents shall be submitted to ENGINEER in writing. Replies will be issued by Addenda via facsimile, or email. Hard copies will follow, either mailed or delivered to all parties recorded by ENGINEER as having received the Bidding Do
Post-Bid
Pipeline
$15,000,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 6, 2025
January 5, 2026
Multiple Locations, Zachary, LA
Related To This Project
Zachary, LA
Bid Date: Nov 19 2025
Zachary, LA
Bid Date: Nov 19 2025
Zachary, LA
--
Zachary, LA
Bid Date: Jan 27 2026
Zachary, LA
Bid Date: Nov 04 2025
Zachary, LA
Bid Date: Nov 13 2025
Zachary, LA
Bid Date: Jan 14 2026
Zachary, LA
Bid Date: Jul 31 2025
Zachary, LA
Bid Date: Aug 04 2025
Zachary, LA
Bid Date: Aug 06 2025
Zachary, LA
Bid Date: Jul 16 2025
Zachary, LA
Bid Date: Jun 24 2025
Zachary, LA
Bid Date: Jun 12 2025
Zachary, LA
Bid Date: Jun 11 2025
Zachary, LA
Bid Date: Jun 12 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.