Published January 14, 2026 at 7:00 PM
Updated January 15, 2026
Site work and new construction of a pre-engineered storage facility in Plymouth, Indiana. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.
**As of January 14, 2026, the project was awarded to ML Taylor Construction but the awarded amount is not available.** Bid work shall consist of Construction of a new free standing storage building on site at the Eastwood Place Property . All bids shall be executed on forms provided in the specifications or approved equal provided by the bidder. Each bid must include a "non-collusion" affidavit and fully enclosed HUD 5369-A form, and a Bid Bond in the amount of five (5) percent of the amount of the bid. This bond will be forfeit in case of any failure to enter into the contract at the bid price after notification of acceptance of such bid. Section 3 Performance as well as all other forms as outlined in the specifications must accompany all bids. Both the Architect and Housing Authority desire all prime contractors submitting bids to encourage all minority subcontractors to perform any portions of the work which will not be performed by the contractors forces or could be performed by the minority subcontractor Bidders must submit written evidence that they have solicited quotations from qualified Section 3 subcontractors at the time the bidder submits its bid to the Housing Authority for all portions of work the bidder is not proposing to complete with his forces. The Architect and Housing Authority also desire that the prime contractor will make an attempt at the hiring of those housing residents that can perform any function of the work successfully. The Peru Housing Authority is in no way obligated to accept the lowest or any other bid submitted and reserves the right to reject any and all bids. The Peru Housing Authority also may waive informalities in any bid if it judges to do so and to defer the acceptance or rejection of such bids until the financial arrangements for the project bid are completed. Contractor awarded project will provide an acceptable Performance and Payment bond equal to 100% of the contracted price
Award
Warehouse / Distribution - Pre-Engineered Storage Building
$596,000.00
Public - City
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 6, 2025
December 8, 2025
Eastwood Dr, Plymouth, IN
Related To This Project
Plymouth, IN
--
Plymouth, IN
Bid Date: Oct 28 2025
Plymouth, IN
Bid Date: Dec 16 2025
Plymouth, IN
Bid Date: Aug 22 2025
Plymouth, IN
Bid Date: May 27 2025
Plymouth, IN
Bid Date: May 05 2025
Plymouth, IN
Bid Date: May 05 2025
Plymouth, IN
Bid Date: May 05 2025
Plymouth, IN
Bid Date: Jan 27 2025
Plymouth, IN
Bid Date: Feb 11 2026
Plymouth, IN
Bid Date: Dec 10 2024
Plymouth, IN
Bid Date: Nov 14 2024
Plymouth, IN
Bid Date: Nov 12 2024
Plymouth, IN
Bid Date: Oct 09 2024
Plymouth, IN
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.