Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 22, 2026 at 7:00 PM
Updated January 23, 2026
Site work for a development in Steamboat Springs, Colorado. Completed plans call for site work for a development.
PROJECT LOCATION: The Project is located along approximately 4.5 miles of the Stillwater Ditch (Ditch), starting approximately 0.25 miles downstream of Yamcolo Reservoir outlet, Garfield and Routt Counties Colorado. A. The location of the work is: Stillwater Ditch, starting approximately 0.25 miles downstream of Yamcolo Reservoir outlet, Garfield County Colorado. From the Town of Yampa, southwest on CO Rd 7 and Forest Road 900 for about 11 miles. This is the start of the Stillwater Ditch. Access to the Stillwater Ditch can also be made from the intersection of Forest Road 900 to Forest Road 910. Once on Forest Road 910, travel about 1 mile to intersection with Stillwater Ditch. This is approximately 1 mile downstream on the Stillwater Ditch. B. The work includes furnishing all labor, tools, materials, equipment, transportation, and services required for completion of the above project. The Work generally includes: The Project work includes cutting and slash management extending approximately 110 feet downslope (north) of the Ditch and 890 feet upslope (south) of the Ditch. The total width of the treatment area will not exceed 1,000 feet at any point. The treatment includes canopy spacing, ladder fuel removal, and group selection or "patch cuts". Treatments are specific to distance from the edge of both sides of the Ditch and include prescriptions for: Zone 1: 0-10 feet from the edge of the Ditch, Area = 8 Acres. Zone 2: 10-110 feet from the edge of the Ditch, Area = 70 Acres. Zone 3: 110 feet from the edge of the Ditch and continuing upslope, Area = 214 Acres. Priority Bid - The Priority Bid is detailed in the Priority Bid Schedule and is the scope of the project that will be awarded in 2025, pending the finalization of expected USFS project activity authorization. The primary goal of the Project is to minimize post-fire impacts to the Ditch, which can include in-stream erosion, debris flow, excessive downstream erosion, and sedimentation. By reducing forest fuels incrementally upslope from and in proximity to the Ditch, wildfire intensity may be reduced, resulting in a reduced magnitude of post-fire impacts. The fuel reduction will primarily target the treatment of <6" Diameter Breast Height (DBH) subalpine fir, which will allow for increased species diversity and age classes over time and will contribute to a healthier and more resilient forest type less prone to high severity wildfire.
Bid Results
Conservation and Development
$499,400.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 20, 2025
December 22, 2025
To Be Determined, Steamboat Springs, CO
Related To This Project
Steamboat Springs, CO
Bid Date: Nov 10 2025
Steamboat Springs, CO
Bid Date: Nov 12 2025
Steamboat Springs, CO
--
Steamboat Springs, CO
--
Steamboat Springs, CO
Bid Date: Dec 11 2025
Steamboat Springs, CO
--
Steamboat Springs, CO
Bid Date: Dec 18 2025
Steamboat Springs, CO
Bid Date: Nov 21 2025
Steamboat Springs, CO
Bid Date: Oct 31 2025
Steamboat Springs, CO
Bid Date: Oct 15 2025
Steamboat Springs, CO
Bid Date: Oct 07 2025
Steamboat Springs, CO
--
Steamboat Springs, CO
Bid Date: Oct 02 2025
Steamboat Springs, CO
--
Steamboat Springs, CO
Bid Date: Aug 28 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
