Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 6, 2026 at 7:00 PM
Updated January 7, 2026
Site work and paving for a road / highway in Lake Alfred, Florida. Completed plans call for site work for a one-story above grade road / highway.
**As of January 06, 2026, the project was awarded to G&G Site Development, with an awarded amount of $278,769.87.** The City of Lake Alfred is requesting sealed bids for street resurfacing with the following specifications: E. Hoffman from 17/92 to Glencruiten; E. Columbia from S. Seminole to S. Carolina; E. Sanford from S. Towner to S. Ramona; S. Winona from W. Commings to Boat Ramp; N. Echo from S. Winona to dead-end; S. Char-Mil Ave from E. Echo to McKay Blvd. All potholes shall be patched before resurfacing. Intersections when needed will be milled for a smooth transition. Roadways without curbing will be edged and swept before resurfacing. Roadways with curbing will be cleaned and free of vegetation before resurfacing. Contractor will arrange work so it will not interfere with the normal flow of daily traffic. Contractor will arrange a work schedule to accommodate schools and school crossings at times when they are in use. Resurfacing will be done with a minimum of two inches of type SP 9.5 or better asphalt. Roads to be milled will be done at a minimum of one inch. New surfacing will be done to ensure a smooth transition around manholes in the paved area. Contractor will perform manhole ring and cover adjustments. All traffic control and detouring will be the responsibility of the contractor. The City reserves the right to use any or all milling removed from City streets. Contractor shall provide advanced notice to residents and businesses that will be impacted by work being performed. Any questions, please get in touch with Clifton Bernard, Public Works Director.
Award
Roads / Highways
$278,770.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 8, 2025
February 4, 2026
Multiple Locations, Lake Alfred, FL
Related To This Project
Lake Alfred, FL
Bid Date: Feb 12 2026
Lake Alfred, FL
--
Lake Alfred, FL
--
Lake Alfred, FL
Bid Date: Aug 29 2025
Lake Alfred, FL
Bid Date: Aug 06 2025
Lake Alfred, FL
Bid Date: May 08 2025
Lake Alfred, FL
Bid Date: Mar 31 2025
Lake Alfred, FL
Bid Date: Jan 27 2025
Lake Alfred, FL
Bid Date: Jan 30 2025
Lake Alfred, FL
Bid Date: Jan 17 2025
Lake Alfred, FL
Bid Date: Aug 21 2024
Lake Alfred, FL
Bid Date: Jul 18 2024
Lake Alfred, FL
--
Lake Alfred, FL
Bid Date: Feb 06 2024
Lake Alfred, FL
Bid Date: Nov 29 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
