Remodeling of a municipal facility in Lake Alfred, Florida. Completed plans call for the remodel of a one-story above grade municipal facility.
The Federal Labor Standards Act will be followed, and the City is an Equal Opportunity Employer. Minority-owned businesses and contractors are encouraged to bid. Bidders must also submit all forms in the bid packet. The City reserves the right to reject any or all bids, to waive informalities, to re-advertise, and to accept the bid in the best interest of the City, not necessarily the lowest bid. The Lake Alfred City Hall consists of approximately 5,500 square feet. The area currently includes two-stall women's and men's bathrooms, each with three toilets, one urinal, and vanity-style sinks. The current bathroom is not ADA-compliant. To transition to an ADAcompliant facility, the proposed project is to modify the existing space and create two ADAcompliant restrooms: one ADA male with an additional urinal, one ADA female, and one unisex. This addition will provide the required public restroom facilities to ensure accessibility for people with disabilities. Scope of Work - Upon commencement of construction, it shall not be interrupted until completed due to this being a public city facility. One Month o Demo and remove all existing restroom components before the commencement of new construction. o Install all new plumbing and any new electrical wiring necessary. o Install new exhaust ventilation in both bathrooms, including controls, ductwork, and roof. o Insulate the interior walls in both restrooms before the installation of new sheetrock. o Install all new ADA equipment: white handicapped toilet, white sink with matte black lever-style hardware, a matte black 36" grab bar, a 42" grab bar, a mirror, a towel dispenser, soap dispenser, and a toilet paper dispenser, insulate under-sink piping, a coat hook, an ADA-compliant threshold, new door with lever-style hardware in all restrooms. All equipment and installations must adhere to the 2010 ADA Standards for Accessible Design and the Florida Building Code. The city will provide ADA specifications for the installation height and placement requirements. o Replace existing light switches with automatic light sensors. o Replace existing lighting with LED lighting in both restrooms. o Tile the restroom floors with a tile choice approved by the City of Lake Alfred. o Tile from the floor up to 1/2 of the wall with tile choice approved by the City of Lake Alfred. Wet wall tiled all the way up. o Finish the remaining drywall. o The City of Lake Alfred shall approve drywall paint color and quality. End Item Data Package: Before approval of the installation, the contractor shall provide the following, as a minimum: o Any as---built modifications (with approval of the Lake Alfred Building Official) as mark---ups to the drawings o Owners' manuals, operating manuals, and installation equipment materials (extra hardware, keys, wrenches, etc) for all equipment Demolition of Main 4" partition block wall - Rebuild and Frame (this is the privacy wall in the hallway) Water Fountain High/Low - ADA Compliant Restroom Floor Tile Trinity Tile, Breton, Dot Anthracite, Mosaic 2x2 Grout: Custom Building Products - Charcoal #60 Restroom Wall Field (up to 48") Daltile, Color Wheel Classic, 3x6, Desert Gray X114 Grout: Custom Building Products - Driftwood #543 Wet Wall (48" up to ceiling) Daltile, Color Wheel Classic, 3x6, Arctic White 0190 Grout: Custom Building Products - Snow White #11 Accent (vertical on wet wall) Daltile, Color Wheel Classic, 3x6, Garden Spot 0141 Grout: Custom Building Products - Shadow #644 LVT Shaw Contract, Terrain II, Pirch 00684 - (Hallway and privacy area) Baseboard - black 4" rubber style Wall Paint Field (Hallway and everything outside the restroom) Sherwin Williams, SW7001 Marshmallow, Shein: Eggshell Restrooms Sherwin Williams, SW7005 Pure White, Shein: Eggshell (inside restroom) Ceiling Tiles Drop Ceiling with a grid similar to what is already installed. Please keep some tiles from the restrooms for the hallway to match the remainder of the building. See specifications Lighting Switches Occupancy sensor Doors Solid Core Oak with Black Metal Door Frames (Black Lever Style Hardware) Water Heater One electric water heater installed to service the restrooms. A slim 40-gallon Water Heater will need a pan and a relief line to the outside. [cut through and add to trench] (There is an existing water heater servicing the kitchen.) Water Closet Accessories Shall be lever style ADA Compliant. Preferably matte black A porta-potty is needed on-site during construction, along with a handwashing station
GC Bidding
Municipal
$200,000.00
Public - City
Remodeling
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 12, 2026
May 19, 2026
120 E Pomelo St, Lake Alfred, FL
Related To This Project
Lake Alfred, FL
Bid Date: Dec 08 2025
Lake Alfred, FL
Bid Date: Aug 29 2025
Lake Alfred, FL
Bid Date: Aug 06 2025
Lake Alfred, FL
Bid Date: May 08 2025
Lake Alfred, FL
Bid Date: Mar 31 2025
Lake Alfred, FL
Bid Date: Jan 27 2025
Lake Alfred, FL
Bid Date: Jan 30 2025
Lake Alfred, FL
Bid Date: Jan 17 2025
Lake Alfred, FL
Bid Date: Aug 21 2024
Lake Alfred, FL
Bid Date: Jul 18 2024
Lake Alfred, FL
--
Lake Alfred, FL
Bid Date: Feb 06 2024
Lake Alfred, FL
Bid Date: Nov 29 2024
Lake Alfred, FL
Bid Date: Dec 05 2023
Lake Alfred, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.