BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 10, 2025 at 7:00 PM

Updated January 7, 2026

Site work and paving for a mixed-use development in Keenesburg, Colorado. Completed plans call for site work for a bridge / tunnel; playground / park / athletic field; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Reference Number 0000401505 Roadway improvements on Nelson Ave and Ash St, culvert headwall and wingwalls at the entrance of Memorial Park, curb and gutter for parking area, and Memorial Park phase 1 improvements. The project is for the following general work services: 1650 LF of roadway improvements to Nelson Ave comprised of gravel paving, curb and gutter, and a 135 SF ADA ramp section of attached sidewalk. Class 5 CDOT road base anchored on both sides by rollover curb and gutter to serve as gravel pavement for the remaining length to access the park and surrounding its parking lot. Raised landscape islands and limited concrete pavement and sidewalk for ADA access to a pavilion structure, (pavilion structure provided by the Town), will also be included in the project. Decorative pavers will surround the pavilion structure and various landscape plantings and irrigation sleeves are denoted on the plans for installation. The project site has been previously graded and only fine grading for project completion remains. Question Deadline 10/24/2025 at 3:00 PM MT Questions are submitted online No, Questions may be submitted in writing by email, no later than Friday, to: Kent Bruxvoort at kent.bruxvoort@pec1.com. Question responses will be provided to all prospective bidders on the Project's contact list by Applicable project dates are summarized in Table 1. Estimated Kick-Off Date December 1, 2025 Completion Date January 31, 2026 Buyer Preferences, Guidelines & Requirements General Requirements - FOB Destination - Insurance Required - Irrevocable Letter of Credit - Material Safety Data Sheets Required - Safety Standards Plan Bonding Requirements - Bid Bond 100 % - Performance Bond 100 %

Bid Results

Playgrounds / Parks / Athletic Fields

$436,948.00

Public - City

Paving, Site Work

24

5

26

7

Subscribe For Documents

122 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
213
Active Projects
103
Bidding Soon
1,148
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 7, 2025

December 1, 2025

Project location map

Main St & Nelson Ave, Keenesburg, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.