BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 15, 2025 at 7:00 PM

Updated November 16, 2025

Site work for a water / sewer project in Albion, Washington. Completed plans call for site work for a one-story above grade water / sewer project.

The work includes electrical, mechanical piping, fencing, chlorination, grading, site work, 6-inch and 8-inch water mains, a fire hydrant, building improvements, a packaged booster pump system, an emergency backup generator, retaining walls, fencing, water meter replacement (including new water meters, meter boxes, meter setters, and an automated meter reading system), and surface restoration; along with other miscellaneous work to complete the project. The work may include additive alternates for replacement of additional water meter boxes and roadway improvements to the owner's reservoir tank (including grading and earthwork, geotextile, and gravel surfacing). The expected project duration is 240 calendar days. Bids will be received and accepted only via the online electronic bid service through QuestCDN.com. Bid security equal to 5 percent of the bid price is required. All bidders must be licensed in the State of Washington. The project is funded by federal funds, so all work is subject to federal and state requirements, including prevailing wage rates. All iron, steel, manufactured products, and construction materials used in the project must be produced in the United States, unless a waiver is approved. Minority and women-owned businesses are encouraged to bid. Prospective bidders are urged to register as a plan holder on the designated website, which will be updated with addenda and other relevant bid information. For further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the instructions to bidders included in the bidding documents. Project Description Project Category Code: Generator, Fire Hydrant, Fencing/Guardrails/Handrails, Water Main (Repair/Replace) Rehabilitation, Water Infrastructure (Water Meters) Description: The Work for this Project includes electrical, mechanical piping, fencing, chlorination, grading, site work, 6-inch and 8-inch water mains, a fire hydrant, building improvements, a packaged booster pump system, an emergency backup generator, retaining walls, fencing, water meter replacement (including new water meters, meter boxes, meter setters, and an automated meter reading system), and surface restoration; along with other miscellaneous Work to complete the Project. The Work may include additive alternates for replacement of additional water meter boxes and roadway improvements to the Owners reservoir tank (including grading and earthwork, geotextile, and gravel surfacing). Additional Description: This Project has an expected duration of 240 calendar days.

Bid Results

Water / Sewer

$1,736,798.00

Public - Federal

Site Work

81

49

4

11

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
22
Bidding Soon
375
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2025

January 13, 2026

Project location map

310 N ‘F’ Street Albion Washington, Albion, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.