Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 4, 2025 at 7:00 PM
Updated December 16, 2025
Site work for a water / sewer project in Seattle, Washington. Completed plans call for site work for a water / sewer project.
This Project is located at three separate locations in the City of Seattle: 1) E Pike St & 12th Ave; and 2) SW Dakota St & 26th Ave SW; and 3) NE 107th St & Lake City Way NE. Construction is expected to start Spring 2026 through 2027. This Project consists of the following elements of Work: Replacement of approximately 200 linear feet of sanitary sewer mainline pipe (ductile iron pipe (DIP) ranging from 8" to 12" in diameter) and 500 LF of storm drainage mainline pipe (ductile iron pipe (DIP) ranging from 6" to 12" in diameter). Additional elements of work include: traffic control, temporary sewer bypass, abandon existing sewer mainline pipes, assist SPU Water Crew with cut & cap of watermain pipe and temporary water service installation, electrical conduit & vault installation (E Pike St), post installation CCTV inspection, and surface restoration (pavement, stairs, landscaping, and ADA curb ramps). o SW Dakota St Site: o Pipe repair is located within ROW on a pedestrian bridge, but access will require use of surrounding Seattle Parks property. Vehicular access will be required to both sides of the bridge. All work on bridge will need to be hand-carried. o Pipe crosses Longfellow Creek and area is subject to various environmental construction schedule restrictions. Heavy construction will be limited to August and September. o Repair location is not impacted by the FIFA construction moratorium. o NW 107 th St Site: o Pipe repair is located on a street that provides direct access from Lake City Way to Nathan Hale High School's student parking lot. Construction will only be allowed during Seattle Public Schools summer break, approximately mid-June to late-August. o Repair location is not impacted by the FIFA construction moratorium. o E Pike St Site: o Pipe repair is located on a busy intersection on Capitol Hill and will involve extensive traffic control coordination with SDOT. o Repair includes an early work portion to provide underground infrastructure to allow SCL to permanently reroute wires from above intersection. (Early work starting April 1, 2026) o Repair location is subject to various summer event restrictions (mid-June to late July) and will be impacted by the FIFA construction moratorium. Project Location: This Project is located at three separate locations in the City of Seattle: 1) E Pike St & 12th Ave; and 2) SW Dakota St & 26th Ave SW; and 3) NE 107th St & Lake City Way NE. Question Response Deadline:November 6, 2025, 5:00pm All future questions during the advertisement period must be directed to Kai Fan. Questions must be submitted, four (4) Business Days before the Bid Opening Date. Only written questions will be accepted for this project. Please submit your questions to Kai Fan at kai.fan@seattle.gov. 20% WMBE Question Deadline 11/06/2025 at 5:00 PM PT
Award
Water / Sewer
$2,472,297.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 12, 2025
January 12, 2026
Multiple Locations, Seattle, WA
Related To This Project
Seattle, WA
Bid Date: Nov 21 2025
Seattle, WA
Bid Date: Nov 12 2025
Seattle, WA
Bid Date: Jul 16 2025
Seattle, WA
Bid Date: Nov 26 2025
Seattle, WA
Bid Date: Nov 21 2025
Seattle, WA
--
Seattle, WA
Bid Date: Oct 16 2025
Seattle, WA
Bid Date: Nov 12 2025
Seattle, WA
Bid Date: Nov 13 2025
Seattle, WA
--
Seattle, WA
Bid Date: Nov 12 2025
Seattle, WA
Bid Date: Oct 30 2025
Seattle, WA
Bid Date: Nov 20 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.