BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 4, 2025 at 7:00 PM

Updated November 5, 2025

This is a service / maintenance or supply contract in Torrington, Connecticut. Contact the soliciting agency for additional information.

Torrington Board of Education is seeking a request for quote (RFQ) for snow removal. All bidders must attend a mandatory pre-bid meeting. The entire bid packet must be returned, with each page initialed, to show understanding of all requirements of the bid document. Only bidders who attend the meeting will be allowed to submit a quote. All instructions for bidding will be disclosed via email upon request. Bids must be submitted sealed and marked appropriately to the specified address, where they will be opened and read aloud. The Torrington Board of Education does not discriminate based on any protected class status. Item 1: Four informational only drone images of the 50 Major Besse Drive complex have been added to the RFP. Bidders are responsible for the snow removal from all driveways, access roads and parking lots as originally stated in the bid package. Request for interpretation of any portion of the bid may be directed by email to Dean Pergola, Director of Facilities, at dpergola@torrington.org All replies will be via email, and a copy of any such inquiry and advice (if deemed vital to the bid) will be made available to each prospective bidder via email. Bidders should check the web site,for addendums/updates 48 hours prior to the bid opening. An addenda will be issued no later than 2 days prior to the date of receipt of the bid. The Torrington Board of Education is seeking sealed proposals for comprehensive snow removal services for six school properties and one municipal lot for the seasons beginning November 1, 2025, through April 15, 2026, with the option to renew for up to five total years. Scope of Work Snow removal from all driveways, access roads, and parking lots at the following locations: Torrington High School/Middle School/Central Administration (50 Major Besses Drive) Torringford School (800 Charles Street) Fast Academy School (500 Migeon Ave) Torrington Intermediate School (295 East Pearl Road/200 Middle School Drive) Southwest School (340 Litchfield Street) Vogel Wetmore School (68 Church Street) and the municipal lot on Mason Street Salting of driveways, roads, and lots to ensure safety, especially in freezing conditions Relocation of snow/ice as determined necessary by Board authorities (costs borne by contractor) Addressing frozen runoff issues as needed Accommodating regular school hours, delayed openings, early dismissals, and after-hour/weekend events All roads/lots must be cleared before school opening times Compliance with Board decisions for snow-related scheduling

Post-Bid

Educational

$200,000.00

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
751
Active Projects
334
Bidding Soon
5,247
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 28, 2025

November 1, 2025

Project location map

Multiple Locations, Torrington, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.