Site work and new construction of a transportation facility in Mobile, Alabama. Completed plans call for the construction of a 140,000-square-foot, one-story above grade transportation facility.

The work consists of the following improvements: · Terminal Completion: Interior fit-out of 140,000 SF terminal building, including interior framing, MEP, and finish work. Also includes completion of the apron level construction, including masonry, framing, basic finishes, MEP systems and minor structural modifications. Terminal completion also includes installation of exterior façade finishes comprised primarily of Exterior Insulation and Finish Systems. · Central Utility Plant: Includes installation of all equipment, piping, electrical and HVAC work necessary to complete the utility plant. Work also includes the installation of hydronic piping between the utility plant and other airport buildings. The following bid items are broken out on the bid forms for this project: Bid Item #1 Drywall/Acoustical Pre-bid 10/15/2025 & 10/21/2025 at 9:00 am Bid Item #2 Tile/Terrazzo/Flooring Pre-bid 10/15/2025 & 10/21/2025 at 9:00 am Bid Item #3 Painting Pre-bid 10/15/2025 & 10/21/2025 at 9:00 am Bid Item #4 Exterior Insulation and Finish Sys. Pre-bid 10/15/2025 & 10/21/2025 at 9:00 am Bid Item #5 Mechanical/Plumbing Pre-bid 10/15/2025 & 10/21/2025 at 1:00 pm I - 3 BFM Terminal and Central Utility Plant Completion Package ISSUED FOR BID Sept. 26, 2025 Bid Item #7 Electrical Pre-bid 10/15/2025 & 10/21/2025 at 1:00 pm Bid Item #8 Technology Pre-bid 10/15/2025 & 10/21/2025 at 1:00 pm Bid Item #9 Miscellaneous Trades Pre-bid 10/15/2025 & 10/21/2025 at 9:00 am Some of the work that is part of the project is within the Air Operation Area of the airport. Special conditions apply as to safety and security measures and availability of working areas due to this condition. Bidders are notified that a construction-phasing schedule has been developed in order to minimize the inconveniences to the airport users.

Post-Bid

Transportation Terminals

$60,000,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

122 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
38
Bidding Soon
755
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 6, 2025

December 22, 2025

Project location map

2455 Michigan Ave, Mobile, AL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.