Published November 5, 2025 at 7:00 PM
Updated November 7, 2025
Site work and new construction of a transportation facility in Mobile, Alabama. Completed plans call for the construction of a 140,000-square-foot, one-story above grade transportation facility.
The work consists of the following improvements: · Terminal Completion: Interior fit-out of 140,000 SF terminal building, including interior framing, MEP, and finish work. Also includes completion of the apron level construction, including masonry, framing, basic finishes, MEP systems and minor structural modifications. Terminal completion also includes installation of exterior façade finishes comprised primarily of Exterior Insulation and Finish Systems. · Central Utility Plant: Includes installation of all equipment, piping, electrical and HVAC work necessary to complete the utility plant. Work also includes the installation of hydronic piping between the utility plant and other airport buildings. The following bid items are broken out on the bid forms for this project: Bid Item #1 Drywall/Acoustical Pre-bid 10/15/2025 & 10/21/2025 at 9:00 am Bid Item #2 Tile/Terrazzo/Flooring Pre-bid 10/15/2025 & 10/21/2025 at 9:00 am Bid Item #3 Painting Pre-bid 10/15/2025 & 10/21/2025 at 9:00 am Bid Item #4 Exterior Insulation and Finish Sys. Pre-bid 10/15/2025 & 10/21/2025 at 9:00 am Bid Item #5 Mechanical/Plumbing Pre-bid 10/15/2025 & 10/21/2025 at 1:00 pm I - 3 BFM Terminal and Central Utility Plant Completion Package ISSUED FOR BID Sept. 26, 2025 Bid Item #7 Electrical Pre-bid 10/15/2025 & 10/21/2025 at 1:00 pm Bid Item #8 Technology Pre-bid 10/15/2025 & 10/21/2025 at 1:00 pm Bid Item #9 Miscellaneous Trades Pre-bid 10/15/2025 & 10/21/2025 at 9:00 am Some of the work that is part of the project is within the Air Operation Area of the airport. Special conditions apply as to safety and security measures and availability of working areas due to this condition. Bidders are notified that a construction-phasing schedule has been developed in order to minimize the inconveniences to the airport users.
Post-Bid
Transportation Terminals
$60,000,000.00
Public - City
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 6, 2025
December 22, 2025
2455 Michigan Ave, Mobile, AL
Related To This Project
Mobile, AL
Bid Date: Nov 07 2025
Mobile, AL
Bid Date: Nov 19 2025
Mobile, AL
Bid Date: Nov 07 2025
Mobile, AL
--
Mobile, AL
Bid Date: Nov 07 2025
Mobile, AL
Bid Date: Dec 01 2025
Mobile, AL
Bid Date: Dec 01 2025
Mobile, AL
Bid Date: Jan 21 2026
Mobile, AL
Bid Date: Nov 07 2025
Mobile, AL
Bid Date: Nov 07 2025
Mobile, AL
Bid Date: Nov 07 2025
Mobile, AL
Bid Date: Nov 07 2025
Mobile, AL
Bid Date: Nov 07 2025
Mobile, AL
Bid Date: Nov 12 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.